BLD-Final | 11/27/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2007 at 4:32:00 PM. Contact: ###-####.
|
FIRE-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, c/n items are complete except approved door hardware at two locations (wash bay and SE mech. room) to be installed as discussed prior to structural final, also noted one exit sign to be removed at the east side of the truckers lounge.
|
BLD-Conference | 11/27/2007 | 11/27/2007 | 11/27/2007 | P | PASS |
Jim Storey
|
|
|
greg Phone #: ###-####
|
FIRE-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | P | FAIL |
Forrest France
|
|
|
Need to provide approved door hardware at several locations, missing signage at the FACP room door, need to test EM lighting at next inspection.
|
BLD-Framing/Rough-in | 11/9/2007 | 11/13/2007 | 11/13/2007 | A | NH |
Jim Storey
|
|
|
greg Phone #: ###-#### need wire support on returns and supplys.
|
Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found that the landscaping has been completed according to approved City plans - PASS
|
BLD-Framing/Rough-in | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Jim Storey
|
|
|
greg Phone #: ###-#### fist floor framing ok
|
BLD-Framing/Rough-in | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PART |
Mike Jordan
|
|
|
greg Phone #: ###-####furouts on exterior walls only, minus plumbing wall, 1st and 2nd floors.
|
BLD-Footing | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | PASS |
Jim Storey
|
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD-Footing | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Jim Storey
|
|
|
gregg ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Other | 5/14/2007 | 5/15/2007 | 5/15/2007 | A | PART |
Jim Storey
|
|
|
craig Note: rebar - 1st thing in morning; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesse ft
|
BLD-Footing | 5/10/2007 | 5/10/2007 | 5/11/2007 | P | FAIL |
Jim Sly
|
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Darla Downs NR........Walked job....pointed out discontinuous horiz. rebar and no pre-formed corners at perimeter footing.
|
BLD-Footing | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 5:12:23 PM. Contact: ###-####.
|
BLD-Footing | 4/30/2007 | 4/30/2007 | 4/30/2007 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 7:18:32 AM. Contact: ###-####.
|
BLD-Footing | 4/24/2007 | 4/25/2007 | 4/25/2007 | A | PART |
Jim Sly
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 80% interior footing pads OK........will pour others later. No special insp Req. Called Engineer.....2500 psi design (although not noted on appr plan). MTI approval on subgrade, at areas of Fill.
|
BLD-Footing | 4/20/2007 | 4/23/2007 | 4/23/2007 | A | CANC |
Jim Storey
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|