FIRE-Final Inspection | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Forrest France
|
|
|
Required corrections are complete, fire life safety passed final inspection.
|
FIRE-Final Inspection | 8/1/2007 | 8/2/2007 | 8/2/2007 | P | FAIL |
Forrest France
|
|
|
Missing handle at one PFE cabinet, door hardware needs repair at the exit from the server room-is not operable at this time.
|
BLD-Final | 7/25/2007 | 7/25/2007 | 7/31/2007 | P | NR |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang needs other trades to sign off
|
BLD-Final | 5/9/2007 | 5/10/2007 | 5/10/2007 | P | PASS |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for btemp occ ok for perm after fire oks for perm and ele
|
FIRE-Final Inspection | 5/4/2007 | 5/7/2007 | 5/7/2007 | A | PART |
Forrest France
|
|
|
Final pending project related FA monitoring for the clean agent suppression system in the data room, noted missing handle at one PFE cabinet in the west hallway, emergency lights/exit signs tested okay.
|
BLD-Framing/Rough-in | 3/22/2007 | 3/26/2007 | 3/26/2007 | A | PASS |
Dave Hannah
|
|
|
mario; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover walls
|
BLD-Framing/Rough-in | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | PART |
Dave Hannah
|
|
|
mario; Phone #: ###-#### Internet Inspection Request from: Victoria Beall framing around doors in corr
|