BLD-Final | 4/9/2010 | 4/12/2010 | 4/12/2010 | A | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | DONE |
Tony Young
|
|
|
|
BLD-Final | 4/2/2010 | 4/7/2010 | 4/9/2010 | P | PASS |
Tony Young
|
|
|
ok to occupy inside of house,, exterior stairs blocked off
|
DOC - Permit Finaled | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Conference | 4/1/2010 | 4/2/2010 | 4/2/2010 | A | PART |
Tony Young
|
|
|
talked with Darrin,, said he is not ready yet.. should be by next Wednesday,, 4/7/2010.. homeowners rep called me asking about project..
|
BLD-Conference | 3/26/2010 | 3/31/2010 | 4/1/2010 | A | DEFR |
Dave Hannah
|
|
|
t/w Darrin
|
BLD-Conference | 3/29/2010 | 3/29/2010 | 3/29/2010 | A | FAIL |
Tony Young
|
|
|
Complaint that people are living in the home with it not being completed by neighbors-could you please check into this-- talked with Darrin,, said he should get final in a week,, waiting on railing,, I will recheck on Wednesday,, reminded him that he does not have an occupancy to stay in house
|
BLD-Conference | 3/19/2010 | 3/19/2010 | 3/26/2010 | P | NH |
Tony Young
|
|
|
t/w Darrin
|
BLD-Final | 2/16/2010 | 3/10/2010 | 3/19/2010 | A | NR |
Tony Young
|
|
|
t/w Darrin
|
BLD-Conference | 2/15/2010 | 2/16/2010 | 2/16/2010 | A | PART |
Tony Young
|
|
|
t/w Darrin will be ready in a month or so,,
|
BLD-Final | 2/9/2010 | 2/11/2010 | 2/16/2010 | A | NR |
Tony Young
|
|
|
call Darrin 1st
|
BLD-Aging Inspection | 2/3/2010 | 2/4/2010 | 2/9/2010 | A | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/15/2009 | 12/15/2009 | 12/16/2009 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | NR |
Tony Young
|
|
|
Darrin; Phone #: ###-#### walk through w/ Darrin on final issues
|
BLD-Final | 1/30/2009 | 1/30/2009 | 2/2/2009 | P | NH |
Tony Young
|
|
|
Darrin
|
BLD-Final | 1/2/2009 | 1/6/2009 | 1/7/2009 | A | NR |
Tony Young
|
|
|
Darrin ###-#### conf on final
|
BLD-Final | 12/26/2008 | 12/31/2008 | 1/6/2009 | A | CANC |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Final | 12/24/2008 | 12/26/2008 | 12/26/2008 | P | CANC |
Tony Young
|
|
|
Bill Phone #: ###-#### resched
|
BLD-Conference | 12/23/2008 | 12/23/2008 | 12/26/2008 | P | NH |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 12/23/2008 | 12/24/2008 | 12/24/2008 | A | NH |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 12/12/2008 | 12/16/2008 | 12/23/2008 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-#### final issues ?s
|
BLD-Final | 12/10/2008 | 12/11/2008 | 12/15/2008 | P | CANC |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Final | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-#### conf walk through on final,, gave paperwork for bank
|
BLD-Grading Inspection | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | DONE |
Terry Records
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, fine grading, revegetation, completion of the roof drain system, paving of the driveway, and reconstruction of an erosion gully on the north side of the lot have not been completed. For this the engineer has recommended a bond of $38,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Conference | 11/18/2008 | 11/18/2008 | 11/19/2008 | P | PART |
Tony Young
|
|
|
per Eric 3 pm Please walk through,, lots of issues remain to be able to obtain a final,, if applicant needs to go back to plan review and rivise plans or resubmit to finish parts of house later he has that option,, however to get a final the way the house is now, all trades need to be finaled out as well as the hillside ordinance issues,, then all building code issues need to be met throughout the home and the scope of the work on the review set of plans
|
BLD-Conference | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PART |
Tony Young
|
|
|
josh Phone #: ###-#### stair ?s
|
BLD-Conference | 3/31/2008 | 4/2/2008 | 4/2/2008 | P | PASS |
Jim Storey
|
|
|
josh Phone #: ###-#### stairs
|
BLD-Conference | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PART |
Tony Young
|
|
|
josh Phone #: ###-#### stair ?s
|
BLD-Conference | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | PASS |
Tony Young
|
|
|
reg Phone #: ###-#### on final
|
BLD-Final | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | NR |
Tony Young
|
|
|
bill Phone #: ###-#### phone conf only,, need all trades and hillside 1st
|
BLD-Framing/Rough-in | 11/8/2007 | 11/9/2007 | 11/9/2007 | P | PART |
Tony Young
|
|
|
richard - ok to cover Phone #: ###-#### ok to cover areas not affected by engineers "fix list"
|
BLD-Framing/Rough-in | 10/29/2007 | 10/29/2007 | 10/30/2007 | P | PART |
Tony Young
|
|
|
richard Phone #: ###-#### ok to insulate,, still need letter of ok from engineer
|
BLD-Conference | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PART |
Tony Young
|
|
|
richard Phone #: ###-####general frame conf,, still need structural engineer to look at job and ok all engineering
|
BLD-Other | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | PART |
Tony Young
|
|
|
redge Note: shear Phone #: ###-#### exterior ok,, need to get letter from structural eng on hold downs,, about a 100 or so
|
BLD-Conference | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### general frame conf..,, need approval from B.O. or plan review for stairs as built
|
BLD-Conference | 8/23/2007 | 8/23/2007 | 8/24/2007 | P | CANC |
Tony Young
|
|
|
Darren, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt out of time
|
BLD-Footing | 4/25/2007 | 4/26/2007 | 4/26/2007 | P | PART |
Jim Sly
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Footings for N. 1/2 of house appears OK.
|
BLD-Footing | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | PART |
Tony Young
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles front house ftgs ok
|
BLD-Foundation | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PART |
Tony Young
|
|
|
Don; Phone #: ###-#### rear basement wall, wip
|
BLD-Other | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | CANC |
Tony Young
|
|
|
Don ###-#### //rebar inspection out of time
|
BLD-Footing | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PART |
Tony Young
|
|
|
don - around 10 am if possible; Phone #: ###-#### Internet Inspection Request from: Victoria Beall basement wall/retaining wall ftgs,, wip, pending soil report,, ok per T. R.
|
BLD-Footing | 3/12/2007 | 3/13/2007 | 3/13/2007 | A | FAIL |
Tony Young
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need soils report 1st
|
BLD-Final | 2/3/2009 | 2/11/2009 | | A | |
Tony Young
|
|
|
Darrin; Phone #: ###-####
|
BLD-Final | 1/7/2009 | 1/21/2009 | | A | |
Tony Young
|
|
|
Darrin ###-####
|