BLD-Final | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PASS |
Jim Sly
|
|
|
dale Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 1/23/2008 | 1/23/2008 | 1/23/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/17/2008 | 1/18/2008 | 1/19/2008 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/17/2008 at 6:35:18 PM. Contact: ###-####.needs code compl. handrails and landing out side garage side door
|
BLD-Grading Inspection | 1/10/2008 | 1/10/2008 | 1/10/2008 | A | DONE |
Terry Records
|
|
|
The grading and drainage has been completed at the above mentioned address. However, the approved grading plan was deviated from and two retaining walls were built that will require a variance. If the variance is not approved the walls will have to be rebuilt as originally approved. For this the engineer has recommended a bond of $7,000.00. The bond has been submitted and the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 8/16/2007 | 8/17/2007 | 8/17/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 6:26:37 PM. Contact: ###-####. ok to cover
|
BLD-Framing/Rough-in | 7/23/2007 | 7/24/2007 | 7/24/2007 | A | PART |
Dave Hannah
|
|
|
mike Phone #: ###-#### everything ok needs to finish fireplace framing and get mec r/i ok to start insulation but still needs fire sprinkler r/i contractor will work with forest on this
|
BLD-Other | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | FAIL |
Dave Hannah
|
|
|
mike Note: nailing for exterior Phone #: ###-#### shear hold downs ok but need to restaple pannels
|
BLD-Other | 7/9/2007 | 7/10/2007 | 7/10/2007 | P | NR |
Mike Jordan
|
|
|
mike - shear nailing Phone #: ###-####. No approved plans on site. Will schedule for am insp. Gave ok to start cover on soffitts only.
|
BLD-Wall cover | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | CANC |
Dave Hannah
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Foundation | 3/22/2007 | 3/22/2007 | 3/22/2007 | P | PASS |
Dave Hannah
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Footing | 3/12/2007 | 3/13/2007 | 3/13/2007 | A | PART |
Tony Young
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ftgs ok,, wip,, changed one ftg size where brick veneer was changed out to synthetic
|