Code Occupancy Approval | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Joe R Venneman
|
|
|
|
Code Occupancy Approval | | | 1/7/2008 | | DONE |
|
|
|
|
BLD-Final | 1/4/2008 | 1/7/2008 | 1/4/2008 | A | PASS |
Dave Hannah
|
|
|
greg Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PASS |
Forrest France
|
|
|
C/N items are completed, life safety inspection passed.
|
FIRE-Final Inspection | 1/3/2008 | 1/3/2008 | 1/3/2008 | A | FAIL |
Forrest France
|
|
|
C/N items are not yet completed.
|
FIRE-Final Inspection | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | NR |
Forrest France
|
|
|
Pending completion of hardware issues.
|
FIRE-Final Inspection | 12/31/2007 | 12/31/2007 | 12/31/2007 | P | FAIL |
Forrest France
|
|
|
Provide approved hardware at two locations on the first floor, one additional PFE is needed for the basement level-see fire code review notes, also need verification regarding number of exits required which will determine EM lighting.
|
BLD-Other | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
greg - handicap ramp rail Phone #: ###-####
|
BLD-Footing | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PASS |
Dave Hannah
|
|
|
greg - exterior basement wall Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | PASS |
Dave Hannah
|
|
|
reinspect; Greg; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover insulation also ok
|
BLD-Footing | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PART |
Dave Hannah
|
|
|
gregg - and beams - please call 45 min prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PART |
Dave Hannah
|
|
|
gregg - and beams - please call 45 min prior to inspection Phone #: ###-#### ok to cover int walls ok to insulate ext walls
|
BLD-Aging Inspection | 7/13/2007 | 7/13/2007 | 7/13/2007 | | PASS |
Dave Hannah
|
|
|
|