BLD-Final | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 10:27:57 AM. ok for perm
|
BLD-Final | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/17/2008 at 11:21:12 AM. Contact: ###-####. ok for temp only per approved plan
|
FIRE-Final Inspection | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 1/16/2008 | 1/17/2008 | 1/17/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire alarm as-builts and updated map for the facp, repair the emergency light at the top of stair #1 and provide permit through the fire dept for the bulk gas as per the review comments.
|
BLD-Conference | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/14/2008 at 11:16:38 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/27/2007 at 6:25:56 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/14/2007 at 8:14:48 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/11/2007 at 7:24:59 PM. Contact: ###-####. wip ok grid
|
BLD-Framing/Rough-in | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/10/2007 at 7:50:22 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 12/5/2007 | 12/6/2007 | 12/6/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 3:53:37 PM. Contact: ###-####. clips tp be instaled through out ceilling. ok to drop tile on non smoke and fire sepetration walls need to seal penatrations.
|
BLD-Framing/Rough-in | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 8:02:06 AM. Contact: ###-####.
|
Code Occupancy Approval | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Framing/Rough-in | 10/19/2007 | 10/22/2007 | 10/22/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/19/2007 at 4:23:39 PM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Framing/Rough-in | 10/17/2007 | 10/17/2007 | 10/17/2007 | P | DEFR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/17/2007 at 8:19:17 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 11:55:09 AM. Contact: ###-####. wip
|
BLD-Other | 10/8/2007 | 10/8/2007 | 10/8/2007 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/8/2007 at 9:39:41 AM. Contact: ###-####. wip ok 2nd floor
|
BLD-Framing/Rough-in | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 3:34:29 PM. Contact: ###-####.wip ok
|
BLD-Other | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/27/2007 at 5:59:34 PM.
|
BLD-Framing/Rough-in | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/26/2007 at 12:07:54 PM. Contact: ###-####. wip ok per plan
|
BLD-Conference | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 4:43:32 PM. Contact: ###-####.wip ok
|
BLD-Framing/Rough-in | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PART |
Tom Arcoraci
|
|
|
elev shaft per plan
|
BLD-Framing/Rough-in | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 8:49:58 AM. Contact: ###-####.
|
BLD-Conference | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/3/2007 at 7:39:30 AM. Contact: ###-####.
|
BLD-Concrete | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/26/2007 at 12:00:24 PM. Contact: ###-####.
|
BLD-Concrete | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/16/2007 at 9:30:01 AM. Contact: ###-####.wip spec insp
|
BLD-Foundation | 6/25/2007 | 6/26/2007 | 6/26/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/25/2007 at 3:18:42 PM. Contact: ###-####.
|
BLD-Footing | 6/20/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/20/2007 at 6:52:42 AM. Contact: ###-####.
|
BLD-Foundation | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/13/2007 at 2:45:25 PM. Contact: ###-####. Elevator shaft............OK pending STRATA special insp, tests, and approvals.
|
BLD-Footing | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/7/2007 at 3:30:30 PM. Contact: ###-####. spec insp
|
BLD-Footing | 6/6/2007 | 6/6/2007 | 6/6/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 7:35:05 AM. Contact: ###-####. wip ok
|
BLD-Footing | 6/2/2007 | 6/4/2007 | 6/4/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/2/2007 at 7:21:15 AM. Contact: ###-####.
|
BLD-Foundation | 5/23/2007 | 5/24/2007 | 5/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/23/2007 at 4:56:19 PM. Contact: ###-####.
|
BLD-Foundation | 5/22/2007 | 5/22/2007 | 5/22/2007 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/22/2007 at 9:17:12 AM. Contact: ###-####. spec ok to date
|
BLD-Footing | 5/18/2007 | 5/18/2007 | 5/18/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/18/2007 at 7:00:27 AM. Contact: ###-####. spec insp
|
BLD-Footing | 5/14/2007 | 5/15/2007 | 5/16/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/14/2007 at 12:39:31 PM. Contact: ###-####. spec insp
|
BLD-Footing | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 1:23:54 PM. Contact: ###-####. wip ok
|
BLD-Footing | 5/10/2007 | 5/11/2007 | 5/10/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 9:23:19 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 10 2007 1:31PM.
|
BLD-Footing | 5/9/2007 | 5/10/2007 | 5/10/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/9/2007 at 11:24:29 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 10 2007 9:30AM.
|
BLD-Footing | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/9/2007 at 11:20:55 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 9 2007 11:31AM.
|