Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00292
StatusFinaled
Name JORDAN-WILCOMB CONST INC
Site Address 807 N 8TH ST
Project NameST JOHNS CATHEDRAL
Customer Number 
ePlanReviewNo
Description
(ST. JOHN'S CATHEDRAL - BASEMENT REMODEL - CHOIR LOFT REMODEL) To remodel the basement (about 11,800 square feet) and the choir loft (about 1,950 square feet) of an existing church. Work is to include interior nonbearing walls, 3 restrooms accessible to the disabled, movable partitions, the structural support for movable partitions, a 1-hr corridor, steel structure support at door headers, grease hoods and ducts, gypsum board ceilings, gypsum board soffits, suspended acoustical ceilings, and finishes. The exterior ramp will be constructed under a future permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/17/20081/18/20081/18/2008PPASS
DetailsTony Young
kevin Phone #: ###-####
FIRE-Final Inspection1/17/20081/18/20081/18/2008APASS
DetailsForrest France
Fire life safety Passed.KR
BLD-Other1/10/20081/11/20081/11/2008AFAIL
DetailsTony Young
kevin - ceiling grid Phone #: ###-####
need clips
BLD-Final11/1/200711/2/200711/2/2007APART
DetailsTony Young
kevin - late morning Phone #: ###-####
east of day chapel ok,, dining and kitchen area ok for temp occ. pending trades
FIRE-Final Inspection11/1/200711/2/200711/2/2007APART
DetailsForrest France
Noted corrections from the previous inspection are complete. Fire life safety for the portion of the remodel east of the Day Chapel area wall separating room 101, hallway 114, and vestibule 102 is satisfactory.
BLD-Final10/31/200711/1/200711/1/2007ANR
DetailsTony Young
kevin Phone #: ###-####
FIRE-Final Inspection10/31/200711/1/200711/1/2007AFAIL
DetailsForrest France
Need to add EM lighting as discussed, missing the north exit door and hardware, need to provide max. occupant load signage, south exit discharge path is not completed at this time.
Code Occupancy Approval  11/1/2007 DONE
DetailsWm. Michael Meloy
Approval only for interior work and not outside landscaping.
BLD-Other10/26/200710/29/200710/29/2007APASS
DetailsTony Young
ceiling inspection//Kevin ###-####
BLD-Other10/26/200710/29/200710/29/2007APASS
DetailsTony Young
ceiling inspection//Kevin ###-####
BLD-Other10/24/200710/26/200710/26/2007APART
DetailsTony Young
ceiling inspection//Kevin ###-####
mostly ok but will re-check on monday
BLD-Other10/23/200710/24/200710/25/2007PPART
DetailsJim Storey
kevin - ceiling Phone #: ###-#### maintane ceilling membrane/ check type 1 duct clearances or if to be wraped/ seal coridor/ protect colm 1 hr const./ if ceilling is a open plenm need rated wire. ok to cut in perimtor on ceilling.
FIRE-Conference10/22/200710/22/200710/22/2007PDONE
DetailsForrest France
Conference regarding contractors intent to pursue a partial approval of fire permits for temporary occupancy approval.
BLD-Conference10/15/200710/15/200710/16/2007PPART
DetailsTony Young
kevin Phone #: ###-####
conf on door landing on north side,, will pour a temp landing and have a step down landing after that to stairs,, so that the lower stair rise will not be affected,, this will be redone next year w/ new landscape plan
BLD-Framing/Rough-in8/28/20078/28/20078/29/2007PPART
DetailsTony Young
kevin Phone #: ###-####
floor area ok
FIRE-Conference8/27/20078/28/20078/28/2007ADONE
DetailsForrest France
On site conference to discuss project scheduling, required exits, exit signage, and duct smoke detection.
FIRE-Conference8/23/20078/24/20078/24/2007PNH
DetailsForrest France
Contractor not available on site or telephone at the time of field visit.
FIRE-Final Inspection8/23/20078/23/20078/23/2007PNR
DetailsForrest France
Intended for an on site conference, to be scheduled as discussed.
BLD-Framing/Rough-in7/27/20077/30/20077/30/2007APART
DetailsTony Young
kevin; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
basement walls east of chapel wall ok pending trades
BLD-Conference6/29/20077/2/20077/2/2007APART
DetailsTony Young
Kevin; Phone #: ###-####
general ?s
BLD-Conference6/28/20076/29/20076/29/2007ACANC
DetailsTony Young
kevin; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
out of time
BLD-Conference6/6/20076/6/20076/8/2007PDONE
DetailsTony Young
Kevin; Phone #: ###-####
w/425 on fire rating issues, exiting issues, etc
BLD-Conference6/5/20076/6/20076/7/2007PDONE
DetailsDave Hannah
Kevin; Phone #: ###-#### Internet Inspection Request from: Hatti James
BLD-Conference6/5/20076/6/20076/6/2007ANH
DetailsTony Young
Kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt