BLD-Final | 1/17/2008 | 1/18/2008 | 1/19/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/17/2008 at 6:33:15 PM. Contact: ###-####.
|
DOC - Permit Finaled | 1/19/2008 | 1/19/2008 | 1/19/2008 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/11/2008 | 1/14/2008 | 1/15/2008 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/11/2008 at 5:18:25 PM. Contact: ###-####. needs fire sprinkler final and temp glass at side door and bathrooms
|
BLD-Final | 1/10/2008 | 1/11/2008 | 1/11/2008 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/10/2008 at 5:06:51 PM. Contact: ###-####. Need P/W and Fire finals.
|
BLD-Grading Inspection | 1/10/2008 | 1/10/2008 | 1/10/2008 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 5:14:51 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/13/2007 | 9/13/2007 | 9/14/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 4:45:54 PM. Contact: ###-####. ok to insulate after fire sprinckler oks
|
BLD-Framing/Rough-in | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 4:45:54 PM. Contact: ###-####. no plans or truss eng on site
|
BLD-Framing/Rough-in | 8/27/2007 | 8/27/2007 | 8/27/2007 | P | FAIL |
Mike Jordan
|
|
|
mike - exterior nailing Phone #: ###-####. Interior shear walls not completed. Noted to framing contractor that interior shear walls need to be continous to cripple walls below with mstc strap in place of holdown as per approved plans. (detail 22, S1) Install floor to floor straps from 1st floor to 2nd floor. c/n posted.
|
BLD-Foundation | 6/11/2007 | 6/11/2007 | 6/11/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2007 at 11:18:10 AM. Contact: ###-####.
|
BLD-Footing | 6/4/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/4/2007 at 7:22:36 AM. Contact: ###-####.
|