BLD-Final | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Dave Hannah
|
|
|
Howard Goul or ###-#### Liza Phone #: ###-#### ok for perm occ
|
Code Occupancy Approval | | | 12/27/2007 | | DONE |
|
|
|
Inspection confirmed dumpster enclosure meets specifications; concrete planters are removed from parking spaces; landscaping is finaled.
|
COD-Stop Work/Reinspection Fee | 12/10/2007 | 12/10/2007 | 12/12/2007 | P | FAIL |
Joe R Venneman
|
|
|
Sent an email to planner Schafer regarding the dumpster enclosure and planter issues. Her response today was that she met with Mr. Goul and informed him that (a) he must use the existing dumpster enclosure by widening it and reducing the slope of the pavement into it; and (b) he must move the planters which are taking up two parking spaces. I am scheduling a new inspection for next month, as it is going to take him quite a while to make the necessary revisions.
|
Code Occupancy Approval | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | FAIL |
Joe R Venneman
|
|
|
Two dumpsters not enclosed per BLD07-00671 and Public Works memo of 3.5.07. Also, planters have been located in a pre-existing parking space and requires planner approval.
I issued Mr. Goul a Correction Notice dated 12/10/07 for failure to enclose the dumpsters and for installing two planters into assigned parking spaces
|
BLD-Final | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PART |
Dave Hannah
|
|
|
ASHLEY NOTE: PLEASE CALL TO MEET WITH Phone #: ###-#### ok for temp occ needs other trades to go perm finish restrooms
|
BLD-Final | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | FAIL |
Dave Hannah
|
|
|
Ashley; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt walked project with contracor made a punchlist has a ways to go
|
FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled per inspection completed by K. Roule.
|
Code Occupancy Approval | | | 9/19/2007 | | FAIL |
|
|
|
Passed
|
BLD-Conference | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PASS |
Dave Hannah
|
|
|
Ashley; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD-Other | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | PART |
Dave Hannah
|
|
|
thermal; late afternoon; Ashley; Phone #: ###-#### Internet Inspection Request from: Hattie James insulation ok ok to cover
|
BLD-Framing/Rough-in | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PASS |
Dave Hannah
|
|
|
Ashley; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to insulate
|
BLD-Framing/Rough-in | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | NR |
Tony Young
|
|
|
ashely Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2007 | 8/1/2007 | 8/1/2007 | A | PART |
Dave Hannah
|
|
|
ashley Phone #: ###-#### roof pannels ok to cover
|
BLD-Wall cover | 7/17/2007 | 7/18/2007 | 7/18/2007 | A | PART |
Dave Hannah
|
|
|
Ashley; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt shear ok to cover ext
|
BLD-Foundation | 5/21/2007 | 5/22/2007 | 5/22/2007 | A | PASS |
Dave Hannah
|
|
|
matt - wall; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|