BLD-Final | 9/11/2007 | 9/12/2007 | 9/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/11/2007 at 3:08:16 PM. Contact: ###-####.
|
DOC - Permit Finaled | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | FAIL |
Troy Cobbley
|
|
|
The fire sprinkler permit needs to be finaled, three fire extinguishers added in the cafeteria and the three existing exit signs in the cafeteria repaired.
|
BLD-Conference | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/17/2007 at 11:51:13 AM. Contact: ###-####. checked 6 bathrooms ok
|
BLD-Final | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/17/2007 at 11:53:05 AM. Contact: ###-####. needs all inspections signed final
|
BLD-Framing/Rough-in | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 5:03:14 PM. Contact: (208) grid ok
|
BLD-Framing/Rough-in | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2007 at 7:32:42 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 7/10/2007 | 7/10/2007 | 7/10/2007 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 7:30:22 AM. Contact: ###-####. OK to cover select framing......
|
BLD-Conference | 6/22/2007 | 6/25/2007 | 6/25/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/22/2007 at 2:36:10 PM. Contact: ###-####. roof top unit framing wip ok
|