Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD07-00680
StatusFinaled
Name CM COMPANY
Site Address 7009 W FRANKLIN RD
Project NameBISHOP KELLY HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BISHOP KELLY HIGH SCHOOL - REMODEL) To remodel and upgrade existing selected classrooms, restrooms, locker rooms and the cafeteria dinning area per approved plans. Work to include, installation of new HVAC Systems, replace existing exterior glazing in various locations, new class room wall finishes, new floor finishes, remodel finishes in both locker rooms, remodel selective restrooms for accessibility and new fixtures and finishes, miscellaneous related interior finishes. This building is fully fire sprinkled any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/11/20079/12/20079/12/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/11/2007 at 3:08:16 PM. Contact: ###-####.
DOC - Permit Finaled9/12/20079/12/20079/12/2007PPASS
DetailsTom Arcoraci
FIRE-Final Inspection8/22/20078/22/20078/22/2007PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection8/17/20078/20/20078/20/2007AFAIL
DetailsTroy Cobbley
The fire sprinkler permit needs to be finaled, three fire extinguishers added in the cafeteria and the three existing exit signs in the cafeteria repaired.
BLD-Conference8/17/20078/20/20078/20/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/17/2007 at 11:51:13 AM. Contact: ###-####. checked 6 bathrooms ok
BLD-Final8/17/20078/20/20078/20/2007ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/17/2007 at 11:53:05 AM. Contact: ###-####. needs all inspections signed final
BLD-Framing/Rough-in8/15/20078/16/20078/16/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/15/2007 at 5:03:14 PM. Contact: (208) grid ok
BLD-Framing/Rough-in7/30/20077/30/20077/30/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/30/2007 at 7:32:42 AM. Contact: ###-####. wip ok
BLD-Framing/Rough-in7/10/20077/10/20077/10/2007PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/10/2007 at 7:30:22 AM. Contact: ###-####.
OK to cover select framing......
BLD-Conference6/22/20076/25/20076/25/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/22/2007 at 2:36:10 PM. Contact: ###-####. roof top unit framing wip ok