Permit Information
Permit NumberBLD07-00792
StatusFinaled
Name HC COMPANY INC
Site Address 222 N 2ND ST Unit: 215
Project NameANDERSON PLAZA
Customer Number 
ePlanReviewNo
Description
(INTERMOUNTAIN EYE CENTER - ANDERSON PLAZA - STE 215) This building is not sprinklered. There is a 1-hour rated exit corridor serving this space and connecting two exit enclosure's serving the second floor. To perform selective interior demolition within the current tenant area. To construct new interior walls to create new exam rooms, optical display area, waiting areas, reception, charts, two accessible restrooms, optical work areas and support areas. Portions of the rated corridor will be modified to relocate or remove doors and install new rated door assemblies with rated glass sidelights as required for rated corridors. Install new ceiling grid in specified location and new tiles throughout; new accessible millwork and sinks in each exam room, breakroom, fitting room and restrooms; upgrade electical, mechanical and plumbing. Complete new interior finishes and reduction controls on lighting fixture's per plan for energy code compliance. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/7/200711/7/200711/7/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/7/2007 at 9:48:31 AM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection10/30/200710/31/200710/31/2007APASS
DetailsForrest France
Fire life safety inspection passed, seal at one door to be installed prior to structural final.
BLD-Wall cover10/18/200710/18/200710/18/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/18/2007 at 10:40:45 AM. Contact: ###-####. ok to cover ceiling in second phase
BLD-Wall cover10/8/200710/9/200710/9/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/8/2007 at 2:29:06 PM. Contact: ###-####.ok to cover lid in doorway
BLD-Conference9/21/20079/21/20079/24/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/21/2007 at 10:05:27 AM. Contact: ###-####.duct work across corradors
BLD-Wall cover9/21/20079/21/20079/24/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/21/2007 at 7:13:47 AM. Contact: ###-####. ok to cover walls
BLD-Final9/6/20079/6/20079/6/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/6/2007 at 7:37:23 AM. Contact: ###-####. ok to move into phase one area
FIRE-Final Inspection9/4/20079/6/20079/6/2007APART
DetailsForrest France
Fire life safety for the area indicated as phase one is acceptable.
BLD-Framing/Rough-in8/30/20078/31/20078/31/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/30/2007 at 2:59:35 PM. Contact: ###-####. ok to cover ceiling corr wall around phase one ok
FIRE-Conference8/30/20078/31/20078/31/2007ADONE
DetailsForrest France
On site conference to discuss HVAC changes related to F/S dampers and supply units affecting submitted fire alarm plans, also discussed project phasing and inspection schedule.
FIRE-Conference8/29/20078/30/20078/30/2007ACANC
DetailsForrest France
Overbooked
BLD-Other8/23/20078/24/20078/24/2007APART
DetailsDave Hannah
steve Note: ceiling grid Phone #: ###-#### ok to cover but still needs to finish fire protecting corrador wallls
BLD-Other8/22/20078/23/20078/24/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/22/2007 at 2:58:15 PM. Contact: ###-####. resceduled for tomorrow
BLD-Wall cover7/6/20077/6/20077/6/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/6/2007 at 7:43:54 AM. Contact: ###-####.
BLD-Wall cover7/3/20077/3/20077/3/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/3/2007 at 7:08:53 AM. Contact: ###-####. ok to one side but needs fire protect floor pent.