BLD-Final | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/20/2007 at 12:28:46 PM. Contact: ###-####. OK for Perm Occ.
|
BLD-Final | 11/16/2007 | 11/16/2007 | 11/19/2007 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/16/2007 at 11:30:24 AM. Contact: ###-####. OK for Temp Occ.....OK for Perm, when Ele, Plm, P/W, and Code Enforce Perms.
|
Code Occupancy Approval | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Carol Montgomery
|
|
|
Complies with DRH07-00020. Pass
I questioned the colors used - signed off per the approved plans on site. (These plans listed "Sugar Cookie" and "Buckwheat" as the approved colors w/white trim.)
|
FIRE-Final Inspection | 11/15/2007 | 11/15/2007 | 11/15/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 11/14/2007 | 11/15/2007 | 11/15/2007 | P | NR |
Jim Sly
|
|
|
randy Phone #: ###-#### Need Fire P/W Code Enf. ACHD
|
BLD-Final | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 3:45:38 PM. Contact: ###-####. Need Fire.
|
FIRE-Final Inspection | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | FAIL |
Troy Cobbley
|
|
|
Not all of the exit signs are functional and others are missing.
|
FIRE-Final Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | CANC |
Troy Cobbley
|
|
|
See entry for this mornings inspection. Overbooked for this afternoon.
|
FIRE-Final Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 | A | FAIL |
Troy Cobbley
|
|
|
Project was not ready for inspection. Exit lights were not finished, duct detectors and remote annunciators had not been installed and the building address was not installed. Inspection was stopped.
|
BLD-Final | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 6:36:51 AM. Contact: ###-####. Need fire final
|
BLD-Other | 11/6/2007 | 11/7/2007 | 11/7/2007 | P | PASS |
Jim Sly
|
|
|
DENTON NOTE: CEILING GRID Phone #: ###-####
|
BLD-Energy code compliance | 9/18/2007 | 9/19/2007 | 9/19/2007 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/18/2007 at 4:02:24 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/17/2007 at 7:50:51 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 3:31:00 PM. Contact: ###-####. Ext.shear nailing OK
|
BLD-Framing/Rough-in | 8/21/2007 | 8/22/2007 | 8/22/2007 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 2:30:45 PM. Contact: ###-####. Roof OK to cover.
|
BLD-Foundation | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/2/2007 at 12:20:00 PM. Contact: ###-####.
|
BLD-Footing | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | PASS |
Jim Sly
|
|
|
danton Phone #: ###-#### No special insp req.
|
BLD-Footing | 6/28/2007 | 6/29/2007 | 6/28/2007 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/28/2007 at 9:45:56 AM. Contact: ###-####. Inspection cancelled from web by: Patricia Smith
|