BLD-Final | 10/5/2007 | 10/8/2007 | 10/8/2007 | A | PASS |
Dave Hannah
|
|
|
c r marvin Phone #: ###-#### ok for perm occ
|
BLD-Final | 9/21/2007 | 9/24/2007 | 9/26/2007 | P | PART |
Dave Hannah
|
|
|
C R MARVIN Phone #: ###-#### nOTE: LATE AS POSSIBLE ok to move into phase two walked project with contractor he will call for final after he finishs several items
|
FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, need to provide signage above the main entry/exit door and install indicator on the egress side.
|
BLD-Other | 9/18/2007 | 9/19/2007 | 9/20/2007 | P | PART |
Dave Hannah
|
|
|
C R BARVIN nOTE: GRID Phone #: ###-#### ceiling grid phase two ok to cover
|
BLD-Framing/Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 | P | PART |
Dave Hannah
|
|
|
metal ceiling; C.R. Marvin; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover hard ceiling
|
BLD-Framing/Rough-in | 9/10/2007 | 9/11/2007 | 9/12/2007 | P | NR |
Dave Hannah
|
|
|
C R MARVIN Phone #: ###-####
|
BLD-Framing/Rough-in | 9/7/2007 | 9/10/2007 | 9/11/2007 | P | PART |
Dave Hannah
|
|
|
CR MARVIN Phone #: ###-#### walls ph 2 ok to cover
|
FIRE-Final Inspection | 9/4/2007 | 9/5/2007 | 9/6/2007 | P | PART |
Forrest France
|
|
|
Final pending completion of the scope of work at the south office area, manual thumbturn at the NW exit door to be removed.
|
BLD-Final | 9/4/2007 | 9/5/2007 | 9/5/2007 | P | PART |
Dave Hannah
|
|
|
CR Marvin; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to move into phase one
|
BLD-Framing/Rough-in | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PART |
Dave Hannah
|
|
|
c.r. marvin - ceiling grid Phone #: ###-#### ceiling grid phase one ok to cover
|
BLD-Final | 8/22/2007 | 8/23/2007 | 8/24/2007 | P | NR |
Dave Hannah
|
|
|
C.R., early p.m. if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | PASS |
Dave Hannah
|
|
|
cr marvin Phone #: ###-#### ok to cover walls
|
BLD-Conference | 6/11/2007 | 6/12/2007 | 6/12/2007 | A | PART |
Dave Hannah
|
|
|
cr marvin-- ###-#### cell-
|