Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD07-00845
StatusFinaled
Name PKC CONSTRUCTION
Site Address 105 N 9TH ST
Project NameSONNA BLDG
Customer Number 
ePlanReviewNo
Description
(CHARLES SCHWAB - SONNA BLDG) To perform interior and minor exterior work to expand an existing 1,653 sq.ft. office into an adjacent 2067 square feet retail space to bring the office to 3,760 square feet. To relocate the existing store front entry door to make an accessible entrance. NOTE: This building is fully fire sprinklered for substitution of one-hour fire-resistive construction. All construction shall be per the approved plans and attached comment list. CZC07-00076. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/5/200710/8/200710/8/2007APASS
DetailsDave Hannah
c r marvin Phone #: ###-#### ok for perm occ
BLD-Final9/21/20079/24/20079/26/2007PPART
DetailsDave Hannah
C R MARVIN Phone #: ###-#### nOTE: LATE AS POSSIBLE ok to move into phase two walked project with contractor he will call for final after he finishs several items
FIRE-Final Inspection9/21/20079/24/20079/24/2007PPASS
DetailsForrest France
Fire life safety is acceptable, need to provide signage above the main entry/exit door and install indicator on the egress side.
BLD-Other9/18/20079/19/20079/20/2007PPART
DetailsDave Hannah
C R BARVIN nOTE: GRID Phone #: ###-#### ceiling grid phase two ok to cover
BLD-Framing/Rough-in9/11/20079/12/20079/12/2007PPART
DetailsDave Hannah
metal ceiling; C.R. Marvin; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover hard ceiling
BLD-Framing/Rough-in9/10/20079/11/20079/12/2007PNR
DetailsDave Hannah
C R MARVIN Phone #: ###-####
BLD-Framing/Rough-in9/7/20079/10/20079/11/2007PPART
DetailsDave Hannah
CR MARVIN Phone #: ###-#### walls ph 2 ok to cover
FIRE-Final Inspection9/4/20079/5/20079/6/2007PPART
DetailsForrest France
Final pending completion of the scope of work at the south office area, manual thumbturn at the NW exit door to be removed.
BLD-Final9/4/20079/5/20079/5/2007PPART
DetailsDave Hannah
CR Marvin; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to move into phase one
BLD-Framing/Rough-in8/23/20078/24/20078/24/2007APART
DetailsDave Hannah
c.r. marvin - ceiling grid Phone #: ###-#### ceiling grid phase one ok to cover
BLD-Final8/22/20078/23/20078/24/2007PNR
DetailsDave Hannah
C.R., early p.m. if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in6/26/20076/27/20076/27/2007APASS
DetailsDave Hannah
cr marvin Phone #: ###-#### ok to cover walls
BLD-Conference6/11/20076/12/20076/12/2007APART
DetailsDave Hannah
cr marvin-- ###-#### cell-