BLD-Final | 2/21/2008 | 2/22/2008 | 3/4/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2008 at 11:50:34 AM. Contact: ###-####.
|
DOC - Permit Finaled | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/25/2008 | 2/25/2008 | 2/25/2008 | A | PASS |
Forrest France
|
|
|
Project related fire alarm and sprinkler permits have been finaled, life safety passed, noted construction partition to be removed when no longer necessary.
|
FIRE-Final Inspection | 2/19/2008 | 2/20/2008 | 2/20/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety per scope of permit work finaled.
|
BLD-Framing/Rough-in | 11/9/2007 | 11/9/2007 | 11/11/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/9/2007 at 10:10:40 AM. Contact: ###-####. ok to cover second lid in corrador ceiling
|
BLD-Framing/Rough-in | 11/5/2007 | 11/5/2007 | 11/6/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2007 at 8:21:10 AM. Contact: ###-####. ok to cover corrador ceiling
|
BLD-Framing/Rough-in | 10/31/2007 | 11/1/2007 | 11/2/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2007 at 1:49:33 PM. Contact: ###-####.corrador walls ok to cover
|
BLD-Framing/Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 5:38:18 AM. Contact: ###-####. ok to cover floor on third floor
|