BLD-Final | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
DOC - Permit Finaled | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PASS |
Forrest France
|
|
|
Items on correction notice verified for compliance, fire life safety inspection passed, contractor to provide "door to remain unlocked while building is occupied" signage at the main entry/exit prior to structural final as discussed, PFE's to be installed at tenant occupancy.
|
BLD-Conference | 9/19/2007 | 9/19/2007 | 9/20/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/14/2007 | 9/17/2007 | 9/17/2007 | P | FAIL |
Dave Hannah
|
|
|
jim Phone #: ###-#### needs fire signoffs
|
FIRE-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | FAIL |
Forrest France
|
|
|
Missing approved door hardware at the second floor stairway exit and office doors, need to install two exit signs at the 2nd floor as red-lined per plan review, missing a fire sprinkler head in a utility closet on the second floor, remove the manual thumbturn at the main entry/exit door, provide lever hardware at all locations as indicated on plans, no fire sprinkler protection has been provided for the mech/utility room on the first floor, need to final fire sprinkler permit prior to life safety final.
|
BLD-Framing/Rough-in | 7/27/2007 | 7/27/2007 | 7/27/2007 | P | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
BLD-Conference | 5/18/2007 | 5/21/2007 | 5/21/2007 | A | PART |
Dave Hannah
|
|
|
jim campbell; Phone #: ###-#### Internet Inspection Request from: Delphine Kavanaugh went over project and ada ramp
|