Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD07-00917
StatusFinaled
Name BOISE HIGH SCHOOL
Site Address 1010 W WASHINGTON ST
Project NameBOISE HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BOISE HIGH SCHOOL - 1st, 2nd & 3rd FLR AREAS) To create a 500 sq. ft. area on the floor for a stair enclosure area to include the main entry and install new fire-rated exit doors from first floor through stair enclosure; modify 6,900 sq. ft. portion of the second floor changing storage areas into classroom usage and installing new doors across the non-rated corridor between the west & east wings and install doors to separate the auditorium exiting from the main corridor; to remodel a 4,975 sq.ft. area on the 3rd floor changing use from storage to classrooms and a floor opening for the new exit stair enclosure; to perform seismic upgrade at first, second & third floors and at the roof structure, tying the structural framing to the exterior walls; infill third floor at removed old stair between second and third floors; install new handrails at exterior stairs from second floor to grade, per approved plans. Work includes select interior demolition of portion of second and third floors in the southwest corner to allow construction of a new 1-hour enclosed stairway (does not connect to the basement). To install structural support for the new stairway enclosure walls and landings; cut a new opening in a masonry wall on the first floor as part of the 1-hour enclosure that will include the existing main floor exit leading directly to the exterior; install 60 minute fire-rated, labeled, self-closing, doors at stair enclosure entries; to upgrade the floor/ceiling area directly below the 1-hour enclosure and all support structure that will carry the new enclosure to be 1-hour floor/ceiling, beam and column systems. Individually wrap the new W12x72 steel beam and 5x5x1/4 beam support column at the west end of new beam in the basement with listed 1-hour fire-rated assemblies. To brace the parapets to the roof per plans. Upgrade electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/23/20078/24/20078/24/2007PPASS
DetailsJim Sly
jim Phone #: 941-451
Verified affidavit from MTI and final letter from Engineer. C/C issued
DOC - Permit Finaled8/24/20078/24/20078/24/2007PPASS
DetailsJim Sly
BLD-Final8/23/20078/23/20078/23/2007PNR
DetailsJim Sly
JIM Phone #: ###-####
Need 2 HVAC permits finaled.
BLD-Final8/21/20078/22/20078/22/2007PPART
DetailsTony Young
jim Phone #: ###-####
temp occ ok,, need trades complete finals,, letter of approval for special inspections,, and any letter of approvals from architect
FIRE-Final Inspection8/21/20078/22/20078/22/2007APASS
DetailsForrest France
Required corrections have been completed, fire life safety passed inspection.
FIRE-Final Inspection8/20/20078/21/20078/21/2007AFAIL
DetailsForrest France
Missing required exit signs as indicated on approved plan set for the second floor level, also need to install one EM light and repair one existing EM light as annotated, remainder of life safety is acceptable.
BLD-Framing/Rough-in8/14/20078/14/20078/14/2007PPASS
DetailsTony Young
Ceiling grid; Jim; Phone #: ###-#### Internet Inspection Request from: Hattie James
all ceiling grid ok
FIRE-Conference8/7/20078/8/20078/8/2007ADONE
DetailsForrest France
On site visit to discuss fire code review notes and project related fire life safety issues including door hardware, exit signs/EM lighting, sprinkler coverage, fire alarm work, etc.
BLD-Other8/2/20078/3/20078/6/2007PNR
DetailsDave Hannah
jim Note: ceiling grid Late as possible Phone #: ###-####
BLD-Framing/Rough-in8/1/20078/1/20078/1/2007PPASS
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
stair tower drop ceiling ok
BLD-Framing/Rough-in7/27/20077/30/20077/30/2007APART
DetailsTony Young
Jim,, stair tower; Phone #: ###-####
stair tower frame ok,, pending ele, r/in one area
BLD-Framing/Rough-in7/26/20077/27/20077/27/2007ANR
DetailsTony Young
jim Phone #: ###-####
need u l listings,,
BLD-Framing/Rough-in7/19/20077/20/20077/20/2007PPART
DetailsTony Young
jim - sheet rock in basement; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
rock under beam ok
BLD-Other7/18/20077/18/20077/18/2007PPART
DetailsTony Young
jim Phone #: ###-####
masonary window infill ok
BLD-Other7/17/20077/17/20077/17/2007PPART
DetailsTony Young
jim - covering ceiling and fire taping Phone #: ###-####
all 4 ft areas that had been removed for seismic ties are ok now,, back to 1hr via 5/8 X sheetrock and sealed up,,
FIRE-Conference7/12/20077/12/20077/13/2007PDONE
DetailsForrest France
On site visit, discussed repair of existing emergency lighting at the stairways, project schedule, related fire sprinkler and alarm permits.
BLD-Conference7/12/20077/12/20077/13/2007APART
DetailsTony Young
Jim; Phone #: ###-####
stair beam ok w/ wrapping w/ 5/8" to make 1hr assbly,, also 4' around classrooms ok replacing lath and plaster w/ 5/8" and seal to the you can w/ firecaulk,, sprinkler system is in portions of area above and below drop ceilings
BLD-Framing/Rough-in7/13/20077/13/20077/13/2007PPART
DetailsTony Young
jim NOte: 2nd floor Phone #: ###-####
ok to cover hallway areas,,
BLD-Framing/Rough-in7/12/20077/12/20077/13/2007PCANC
DetailsTony Young
Jim; Phone #: ###-####
BLD-Conference7/11/20077/11/20077/12/2007PPASS
DetailsTony Young
JIM Phone #: ###-####
RFI#
wrap of steel beam ok
BLD-Framing/Rough-in7/6/20077/9/20077/9/2007PPART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
3rd floor walls as noted on plans,, pendind elec r/in on some areas
BLD-Footing6/29/20077/2/20077/2/2007APASS
DetailsTony Young
Jim; Phone #: ###-####
stair ftg ok,, also all seismic ties in place
BLD-Footing6/28/20076/29/20077/2/2007APASS
DetailsTony Young
jim Note: rebar - if possible mid morning - concrete order about 11:00 Phone #: ###-####
BLD-Framing/Rough-in6/27/20076/28/20076/28/2007APART
DetailsTony Young
jim Phone #: ###-####
remainder of seismic straps
BLD-Framing/Rough-in6/25/20076/26/20076/26/2007PPART
DetailsTony Young
jim Phone #: ###-####
1st floor and ceiling seismic strapping,, see inspection sheet for room #s
BLD-Other6/15/20076/22/20076/22/2007APASS
DetailsTom Arcoraci
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang 3rd floor 333 334 336 337 rms ok wip
BLD-Other6/15/20076/21/20076/21/2007APART
DetailsJim Sly
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Floor infill framing (old stairway) 2nd to 3rd floor......OK
BLD-Other6/15/20076/20/20076/20/2007ACANC
DetailsJim Storey
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Other6/15/20076/19/20076/19/2007ACANC
DetailsTony Young
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Other6/15/20076/18/20076/18/2007APART
DetailsDave Hannah
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang third floor seismic straping ok to cover