BLD-Final | 10/10/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/10/2007 at 4:44:54 PM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 10/9/2007 | 10/11/2007 | 10/11/2007 | A | PASS |
Forrest France
|
|
|
All corrections were made per forrest notes
|
BLD-Framing/Rough-in | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | CANC |
Dave Hannah
|
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt ext ceiling grid repaired areas ok ok to cover
|
Code Occupancy Approval | 10/4/2007 | 10/4/2007 | 10/4/2007 | A | PASS |
Michael Garner
|
|
|
site inspection complete - bldg/grounds completed according to approved plans - PASS
|
FIRE-Final Inspection | 10/3/2007 | 10/4/2007 | 10/4/2007 | P | FAIL |
Forrest France
|
|
|
Need to add EM lighting per plan including the exit discharge, post max. occupant load signs as discussed, provide one PFE for the basement level, clear the area blocking access to the basement exit door, need to tag the fire extinguishers with current certification.
|
BLD-Framing/Rough-in | 6/25/2007 | 6/26/2007 | 6/26/2007 | P | PASS |
Dave Hannah
|
|
|
keith Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 6/20/2007 | 6/21/2007 | 6/21/2007 | P | PART |
Dave Hannah
|
|
|
Keith, partial inspection at this time; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt walk in cooler ok to cover
|