Permit Information
Permit NumberBLD07-01014
StatusFinaled
Name TONE ATHLETIC CLUB
Site Address 242 N 8TH ST Unit: 200
Project NameFIDELITY BLDG - 2ND FLR
Customer Number 
ePlanReviewNo
Description
(TONE ATHLETIC CLUB - FIDELITY BLDG - STE 200) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction of the building. To create a 2,620 square foot exercise facility on the 2nd story of the Fidelity Building by combining 2 existing tenant spaces. A doorway will be created through an existing masonry wall. Steel headers and jambs will be provided at the new doorway. Additional work includes interior nonbearing walls, a unisex restroom/shower room accessible to the disabled, suspended ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other8/30/20078/30/200712/27/2007ADONE
DetailsForrest France
LS
BLD-Final10/1/200710/2/200710/2/2007APASS
DetailsDave Hannah
mark Phone #: ###-#### ok for perm occ
FIRE-Final Inspection10/1/200710/2/200710/2/2007APASS
DetailsForrest France
c/n items are complete, fire life safety inspection passed.
FIRE-Final Inspection9/7/20079/7/20079/7/2007PPART
DetailsForrest France
The cardio, yoga, open weights, and reception areas are acceptable, noted approved door hardware is to be provided at the re-used existing doors including the yoga and kids rooms, missing one sprinkler escutcheon at the office, remodel east of the brick wall is not complete at this time.
BLD-Framing/Rough-in9/4/20079/5/20079/5/2007APART
DetailsDave Hannah
pj Phone #: ###-#### hard lid in restrooms ok to cover
BLD-Footing8/31/20079/4/20079/4/2007ACANC
DetailsDave Hannah
PJ; Phone #: ###-#### Internet Inspection Request from: Hattie James
FIRE-Conference8/30/20078/30/20078/30/2007AFAIL
DetailsForrest France
NOTE: Issued a "DO NOT OCCUPY" order due to occupancy prior to project fire sprinkler and building life safety final approval and acceptance. Noted several items lacking and work not complete-construction in process. Discovered business underway and public occupancy at the time of a requested project related sprinkler rough-in inspection. Notified the contractor, club manager, and S. Rogers of the action taken. No occupancy allowed until related permit work is complete and finaled.
BLD-Framing/Rough-in8/28/20078/28/20078/29/2007PPASS
DetailsDave Hannah
PJ; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Framing/Rough-in8/17/20078/20/20078/21/2007APART
DetailsDave Hannah
structural steel framing; PJ; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover openning in masonry wall
BLD-Framing/Rough-in7/26/20077/26/20077/26/2007PPASS
DetailsDave Hannah
pj - ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Framing/Rough-in7/24/20077/25/20077/25/2007PPART
DetailsDave Hannah
pj - ceiling grid - pls call 30 mins prior; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang ok to cover old ceiling area after fire oks need to rework new area
BLD-Framing/Rough-in7/5/20077/5/20077/5/2007PPART
DetailsTom Arcoraci
p.j. - partial Phone #: ###-#### install wall bracing per plan and grid not to be attached to walls