Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD07-01248
StatusFinaled
Name STEED CONSTRUCTION
Site Address 1649 W SHORELINE DR
Project NameAGC OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
(Associated General Contractors Office - Shell & Core) - To construct a new 21,350 square foot, two story office shell and core building and related site improvements. The finished core areas include two exit stairways, two restrooms at each floor, elevator, mechanical, electrical and janitor closets, as well as, nonrated corridors at each floor level. This building will be constructed of concrete tilt-up exterior walls and steel frame second floor and roof construction. This building has four proposed future tenant spaces, two on each floor. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is fully fire sprinkled. The sprinklers are used for area and story increases. This building was reviewed as nonseparated uses with a possible A Occupancy as controlling occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/23/20099/23/20099/24/2009 PASS
DetailsDave Hannah
DOC - Permit Finaled9/24/20099/24/20099/24/2009PPASS
DetailsDave Hannah
BLD-Final8/4/20088/4/20088/4/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/4/2008 at 7:46:06 AM. Contact: ###-####.
BLD-Final7/17/20087/18/20087/18/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2008 at 4:06:57 PM. Contact: ###-####. needs to rock under stairs and add one hr door fix ada restroom get other trades to final
FIRE-Final Inspection7/16/20087/17/20087/17/2008PPASS
DetailsForrest France
Shell fire life safety inspection completed acceptable.
Code Occupancy Approval7/15/20087/15/20087/15/2008PPASS
DetailsMichael Garner
site inspection complete - I found that all work has been completed according to approved plans and permits - PASS
FIRE-Alarm Testing7/14/20087/15/20087/15/2008ACANC
DetailsForrest France
Duplicate inspection request-"alarm testing" is covered under project related FIR permits.
BLD-Other6/25/20086/26/20086/27/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/25/2008 at 4:59:07 PM. Contact: ###-####.ceiling grid ok to cover halls
BLD-Conference6/17/20086/17/20086/17/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/17/2008 at 7:29:34 AM. Contact: ###-####. fire caulk top of wall conf rm ok to cover
BLD-Conference6/2/20086/2/20086/2/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/2/2008 at 7:55:08 AM. Contact: ###-####. ok to elev mec room lid
BLD-Conference5/29/20085/29/20085/29/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/29/2008 at 6:15:13 AM. Contact: ###-####. doorways into conf room along 2hr wall ok to cover lids
BLD-Framing/Rough-in5/9/20085/12/20085/12/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/9/2008 at 5:05:33 PM. Contact: ###-####.restroom and hall walls ok to cover
BLD-Framing/Rough-in5/8/20085/8/20085/9/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/8/2008 at 8:22:39 AM. Contact: ###-####. ext framing ok to cover ext
BLD-Conference4/17/20084/17/20084/17/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/17/2008 at 9:25:01 AM. Contact: ###-####.
BLD-Foundation2/7/20082/8/20082/8/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/7/2008 at 4:50:43 PM. Contact: ###-####.
BLD-Footing2/1/20082/4/20082/4/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/1/2008 at 2:21:42 PM. Contact: ###-####. east side
BLD-Concrete1/11/20081/14/20081/14/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/11/2008 at 1:52:09 PM. Contact: ###-####. Conc. tilt panels, wip. Will receive special insp.
BLD-Concrete1/10/20081/11/20081/11/2008PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/10/2008 at 1:57:18 PM. Contact: ###-####.
BLD-Concrete11/30/200712/3/200712/3/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/30/2007 at 10:35:27 AM. Contact: ###-####. they will pour four pannels tomorrow mti will inspect rebar and test concrete
BLD-Footing10/5/200710/8/200710/8/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/5/2007 at 3:32:15 PM. Contact: ###-####.
BLD-Footing9/28/20079/28/20079/28/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/28/2007 at 7:04:11 AM. Contact: ###-####.ftgs along south and east side
BLD-Footing9/25/20079/26/20079/26/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/25/2007 at 10:20:51 AM. Contact: ###-####. column ftgs