(BAJIO'S RESTAURANT - SHOPS AT SPECTRUM POINTE) To construct a 2,268 sq.ft. restaurant at the south end of an existing 9,600 sq. ft. shell building per approved plans. A 2-hour fire barrier wall is being constructed as part of this permit to create a fire area less than 5,000 sq. ft. so tenant space does not require a sprinkler system. Work includes interior walls to create two fully accessible restrooms, a kitchen food prep & service area and a dining / queue area; new electrical, mechanical and plumbing; type I Grease hood / Exhaust system and kitchen equipment; a suspended grid ceiling system in the kitchen area, gyp board ceiling in the restrooms with the dining / queue and accessible route to the restrooms open to existing structure. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/29/200710/30/200710/30/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/29/2007 at 1:56:11 PM. Contact: ###-####. ok for perm occ.
FIRE-Final Inspection10/29/200710/30/200710/30/2007APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection10/29/200710/29/200710/29/2007AFAIL
DetailsTroy Cobbley
Provide exit discharge lighting as discussed.
BLD-Conference10/19/200710/22/200710/22/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/19/2007 at 5:25:58 PM. Contact: ###-####. Verified installation of remaining fire stop and collars on 2hr fire barrier wall.
BLD-Other10/11/200710/12/200710/12/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/11/2007 at 12:47:15 PM. Contact: ###-####.
Grid OK.
BLD-Conference9/17/20079/17/20079/17/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/17/2007 at 7:58:04 AM. Contact: ###-####. Reviewed UL tech data and installation of firestop material at 2hr fire barrier wall.
BLD-Framing/Rough-in9/4/20079/5/20079/5/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/4/2007 at 9:29:59 AM. Contact: ###-####. ok for 2nd layer of rock on 2hr fire barrier wall.
BLD-Framing/Rough-in8/31/20079/4/20079/4/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/31/2007 at 10:49:15 AM. Contact: ###-####. Verified putty pads, 1st. layer of rock, insul on 2hr fire barrier wall.
BLD-Framing/Rough-in8/30/20078/30/20078/30/2007PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/30/2007 at 10:38:05 AM. Contact: ###-####. Interior framed walls ok. One side only on 2 hr fire barrier wall. Needs UL data for roof drain thru penetrations for firestop.
BLD-Framing/Rough-in8/29/20078/30/20078/30/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/29/2007 at 8:33:30 AM. Contact: ###-####. Elec. ri failed.
FIRE-Conference8/24/20078/24/20078/24/2007PDONE
DetailsTroy Cobbley
I let the electrician know that the manual pull station for the hood suppression system is to be mounted 10' to 20' from the hood in the path of egress.