BLD-Conference | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 12/23/2010 | 12/27/2010 | 12/27/2010 | A | PASS |
Mike Jordan
|
|
|
tammy Phone #: ###-####
|
DOC - Permit Finaled | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | PASS |
Mike Jordan
|
|
|
All storage has been removed from mezzanine. Letter of compliance was issued.
|
BLD-Final | 12/17/2010 | 12/17/2010 | 12/17/2010 | P | FAIL |
Mike Jordan
|
|
|
tammy Phone #: ###-####. Notedstorage on top of mezz. above vault, no storage allowed, engineered for office load only(156psf.) Needs to remove storage or provide engineering showing that mezz. is capable of storge loads per IBC.
|
FIRE-Final Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Conference | 12/2/2010 | 12/9/2010 | 12/9/2010 | A | DONE |
Troy Cobbley
|
|
|
Per Tammy things should be complete soon.
|
FIRE-Conference | 12/2/2010 | 12/2/2010 | 12/2/2010 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the project and spoke to Tammy about the need to get the building permit and the project related fire sprinkler permit finaled. I left a correction notice stating the above and also let her know that possibly an extension could be granted by Jennifer but that ultimately if the inspections were not finished I would be forwarding the permit information to a supervisor as per the aging permit policy. A follow up inspection has been set up for next week.
|
BLD-Aging Inspection | 11/18/2010 | 11/18/2010 | 11/24/2010 | | PEND |
Mike Jordan
|
|
|
|
FIRE-Conference | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and found that the restroom has been installed and stairs have been installed to the mezzanine both are lacking sprinkler protection. I spoke to Molli and Tammy about getting the permit finished.
|
BLD-Conference | 6/24/2008 | 6/24/2008 | 6/24/2008 | A | PASS |
Mike Jordan
|
|
|
Called and spoke with Tammy to inquire status of job. Tammy noted that they are almost completed. They are waiting for items that are on back order, but hoped to be completed fairly soon.
|
BLD-Final | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | NR |
Mike Jordan
|
|
|
molly Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PART |
Troy Cobbley
|
|
|
Fire approval for temporary occupancy was given with dave hannimans permission until the restroom in the vault is complete and the mezzanine is complete.
|
BLD-Energy code compliance | 10/24/2007 | 10/25/2007 | 10/25/2007 | A | PASS |
Mike Jordan
|
|
|
tammy - please call 1/2 hr prior to inspection Phone #: ###-####. ok to cover
|
BLD-Framing/Rough-in | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Mike Jordan
|
|
|
Molly or Tammy Phone #: ###-####framing for offices in warehouse only. ok to insul.
|
BLD-Foundation | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | PART |
Mike Jordan
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. wip. Needs to add stirups over doorway.
|
BLD-Footing | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | PASS |
Mike Jordan
|
|
|
Molly; Phone #: ###-#### Internet Inspection Request from: Hattie James
|