Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD07-01673
StatusFinaled
Name NORTHWEST TECHNOLOGIES
Site Address 314 S 9TH ST Unit: 101
Project NameBODO BLDG #4-Foster Bldg
Customer Number 
ePlanReviewNo
Description
(GREYLOCK REALTY - HISTORIC FOSTER BLDG - 1ST STORY AND BASEMENT) This building is fire sprinklered for story increase and for code trade-offs. To construct interior improvements within the basement (1,734 square feet) and on the 1st story (1,795 square feet) of the Historic Foster Building for a new office occupant. The basement and 1st story will be under the control of a single tenant. Work is to include a new stairway to serve the basement, 2 restrooms accessible to the disabled, interior nonbearing walls, interior doors, interior windows, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/28/200712/31/200712/31/2007PPASS
DetailsDave Hannah
craig Phone #: ###-#### ok for perm occ
FIRE-Final Inspection12/27/200712/28/200712/28/2007PPASS
DetailsForrest France
Fire life safety inspection passed, keyed locking hardware at two office doors removed while on site.
BLD-Conference12/18/200712/19/200712/19/2007APART
DetailsDave Hannah
greg Phone #: ###-#### pre final walk
BLD-Other11/7/200711/7/200711/7/2007PDONE
DetailsDave Hannah
greg Note: cover Phone #: ###-####
BLD-Framing/Rough-in11/7/200711/7/200711/7/2007PPASS
DetailsDave Hannah
greg Note: cover Phone #: ###-####
BLD-Conference11/2/200711/5/200711/5/2007ADONE
DetailsDave Hannah
craig Phone #: ###-####
BLD-Conference10/17/200710/18/200710/18/2007APASS
DetailsDave Hannah
craig Phone #: ###-####