BLD-Final | 8/21/2008 | 8/25/2008 | 8/25/2008 | A | PASS |
Dave Hannah
|
|
|
Kelly Wilson ###-#### ok for perm occ
|
FIRE-Final Inspection | 8/20/2008 | 8/21/2008 | 8/21/2008 | P | PASS |
Forrest France
|
|
|
Life safety completed. KR
|
BLD-Framing/Rough-in | 7/31/2008 | 8/4/2008 | 8/4/2008 | A | PART |
Dave Hannah
|
|
|
Rick- ceiling Phone #: ###-#### rooms on nw end ok to cover
|
BLD-Wall cover | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/11/2008 at 11:02:56 AM. Contact: ###-####.ok to cover room walls
|
BLD-Wall cover | 7/7/2008 | 7/8/2008 | 7/8/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/7/2008 at 6:26:25 AM. Contact: ###-####.ceiling grid in hall on north side ok to cover
|
BLD-Wall cover | 6/25/2008 | 6/26/2008 | 6/27/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/25/2008 at 8:08:46 AM. Contact: ###-####. corrador on north side west end ok to cover walls
|
BLD-Final | 6/5/2008 | 6/6/2008 | 6/6/2008 | A | PART |
Dave Hannah
|
|
|
Rock Phone #: ###-#### ok to move into room cou 3622 3621 exam room and restroom all are on west side of smoke wall
|
BLD-Conference | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | PASS |
Dave Hannah
|
|
|
dave: please call dixie about this job - stairwell #10 - floor B Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PART |
Dave Hannah
|
|
|
rock Phone #: ###-#### area a ok to cover ceilings
|
BLD-Framing/Rough-in | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | PART |
Dave Hannah
|
|
|
rock Phone #: ###-#### exp joint ok to cover
|
BLD-Framing/Rough-in | 4/9/2008 | 4/10/2008 | 4/10/2008 | A | PART |
Dave Hannah
|
|
|
rock Phone #: ###-#### ceilings grid ok to cover
|
BLD-Other | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | PART |
Dave Hannah
|
|
|
rock Note: ceiling cover Phone #: ###-#### OK TO COVER ROOMS IN ARES C D AND E
|
BLD-Framing/Rough-in | 2/5/2008 | 2/5/2008 | 2/6/2008 | P | PART |
Dave Hannah
|
|
|
rock Phone #: ###-#### ok to cover walls but must get fire protection on 1hr smoke barrier
|
BLD-Other | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PART |
Dave Hannah
|
|
|
rock Note: cover sheet rock Phone #: ###-#### ok to cover hard lids in two rooms
|
FIRE-Alarm Testing | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | NR |
Forrest France
|
|
|
Inspection request intended for a different permit number.
|
BLD-Final | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | DEFR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/22/2008 at 12:47:49 PM. Contact: ###-####. Dave...Job appears OK. Contractor is OK with entry in Computer. No Occ request card...(just C/C). OK to doc final when fire finals. (check other trades....forgot to).
|
BLD-Framing/Rough-in | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PART |
Dave Hannah
|
|
|
rock Note: cover Phone #: ###-#### ok to cover walls in area B
|
BLD-Framing/Rough-in | 12/12/2007 | 12/13/2007 | 12/14/2007 | A | PART |
Dave Hannah
|
|
|
rock - cover Phone #: ###-#### still needs to fix pent. in fire walls
|
BLD-Framing/Rough-in | 12/5/2007 | 12/6/2007 | 12/6/2007 | A | PART |
Jim Storey
|
|
|
rock Phone #: ###-#### area e needs opening prtection of non-rated boxes,pipes and puddy pads back to back switches at storage rm,and soiled lundrary rm. plming at hidden furout for equment hook up. ok to start gyp but verifcation of fire stopping to be reinspected.
|
BLD-Framing/Rough-in | 11/9/2007 | 11/13/2007 | 11/14/2007 | A | PART |
Dave Hannah
|
|
|
rock Note: cover for sheet Phone #: ###-#### ok to cover walls in section d
|
BLD-Other | 10/15/2007 | 10/15/2007 | 10/17/2007 | P | PART |
Dave Hannah
|
|
|
rock Note: cover Phone #: ###-#### area c ok to cover
|