BLD-Final | 12/26/2007 | 12/27/2007 | 12/27/2007 | P | PASS |
Tom Arcoraci
|
|
|
ivan - fire life safety Phone #: ###-#### per plan
|
FIRE-Final Inspection | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Corrections were made per Troys last inspection.KR
|
BLD-Final | 12/20/2007 | 12/21/2007 | 12/21/2007 | P | CANC |
Tom Arcoraci
|
|
|
ivan Phone #: ###-####
|
FIRE-Final Inspection | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumb turn and repair the automatic flush bolts at the main exit and provide exit discharge lights at the front and rear exits.
|
FIRE-Conference | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | DONE |
Troy Cobbley
|
|
|
The restroom are ok to cover.
|
BLD-Framing/Rough-in | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | PART |
Tom Arcoraci
|
|
|
ivan Note: cover Phone #: ###-####
|
FIRE-Conference | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | DONE |
Troy Cobbley
|
|
|
I discussed wall heights/sprinkler obstructions with the general contractor
|
FIRE-Conference | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | FAIL |
Troy Cobbley
|
|
|
Drove to the job site but contractor was not there. I left a message on his phone.
|
FIRE-Conference | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | DONE |
Troy Cobbley
|
|
|
I went over fire alarm and fire sprinkler requirements with Ivan.
|