Permit Number | BLD07-01707 |
Status | Finaled |
Name |
C BAR CONSTRUCTION
|
Site Address |
519 W FRONT ST
|
Project Name | FRONT 5 BUILDING |
Customer Number | |
ePlanReview | No |
Description |
(OAAS LANEY - 2ND STORY EXPANSION - FRONT 5 BUILDING) This building is fire sprinklered for code trade-offs. To expand the 2nd story within an existing office tenant space by about 331 square feet. After the expansion, the 2nd story of this tenant space will have a total floor area of about 1,851 square feet (34 occupant load) and the 1st story of this tenant space will continue to have a floor area of about 2,665 square feet (43 occupant load). The volume of this tenant space will not change. Work is to include bearing walls, wood joists, wood sheathing, lightweight gypcrete floor topping, guards, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. CJW
|