Permit Information
Permit NumberBLD07-01784
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 512 N 8TH ST
Project NameST MICHAEL'S
Customer Number 
ePlanReviewNo
Description
(ST. MICHAEL'S EPISCOPAL CHURCH - BISHOP TUTTLE HOUSE AND SITE WORK - PHASE I) The Bishop Tuttle House and the Funsten House will be fire sprinklered for story increase and for code trade-offs. To remodel the 3,424 square foot basement and 3,616 square foot 1st story of the Bishop Tuttle House of St. Michael's Episcopal Church. A 950 square foot 1st story mezzanine addition will also be constructed. Work is to include 2 restrooms accessible to the disabled, an elevator shaft, an elevator, interior nonbearing walls, suspended ceilings, a stairway to the new mezzanine, and finishes. The Bishop Tuttle House and the Funsten house will be fully fire sprinklered in conjunction with this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The combination of parcels must be completed before this permit is finaled. DRH07-00182 (see also DRH01-00010 and CUP01-00002) **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/200910/9/200910/9/2009PPASS
DetailsDave Hannah
Eric Phone #: ###-#### ok for perm occ
FIRE-Final Inspection10/8/200910/9/200910/9/2009APASS
DetailsTroy Cobbley
Life safety passed. Building inspector please verify that the emergency light in the basement corridor was repaired.
FIRE-Final Inspection10/5/200910/5/200910/5/2009PPART
DetailsForrest France
Project related fire sprinkler permit finaled. See latest inspection notes for remainder of C/N items.
FIRE-Final Inspection8/12/20098/14/20098/14/2009PPART
DetailsForrest France
Fie life safety walkthrough completed for both buildings, circled items on fire code review notes in need of attention including max. occupant load signs, fire extinguishers-one missing second level, remove manual flush bolt at one pair of doors, need to test EM lighting at some locations with power off, fire sprinkler permit pending corrections, remainder of issues okayed.
FIRE-Conference7/31/20098/3/20098/3/2009ADONE
DetailsForrest France
Regarding items needed for final including project related FIR permit work.
BLD-Final7/30/20097/31/20097/31/2009ANR
DetailsTony Young
Eric Phone #: ###-####
need trades 1st
BLD-Final7/22/20097/24/20097/24/2009PCANC
DetailsJim Storey
Jerry Phone #: ###-#### Harry called to cancel this inspection
BLD-Final7/2/20097/6/20097/2/2009PCANC
DetailsTony Young
Jerry Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
BLD-Conference10/23/200810/24/200810/24/2008APASS
DetailsDave Hannah
jerry Phone #: ###-#### Note:please call 1/2 hr prior to meet with handrail on ramp in basement ok to build as discused
BLD-Conference10/15/200810/15/200810/15/2008PFAIL
DetailsTony Young
David; Phone #: ###-####
no final inspection approval has been made on this permit,, therfore no one should be occupying the remodeled area in my opinion,, I recomended that David consult w/ plan review, zoning for the CUP, the contractor, owner, architect and possibly the f/l/s and building inspectors for the outcome
BLD-Energy code compliance5/1/20085/1/20085/1/2008PPART
DetailsTony Young
jerry - insulation Phone #: ###-####
ceiling area by mech room ok to cover,, no trades in this area
BLD-Framing/Rough-in4/7/20084/7/20084/7/2008PPART
DetailsTony Young
jerry Phone #: ###-####
2 furr out walls on elevator shaft plywood nailing ok,, fixes in progress
BLD-Framing/Rough-in4/3/20084/4/20084/4/2008APART
DetailsDave Hannah
jerry Phone #: ###-#### ok to cover inside of elev shaft
BLD-Framing/Rough-in4/1/20084/2/20084/2/2008AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/1/2008 at 7:59:29 AM. Contact: ###-####. needs to fire block at floor lines in elev shaft
BLD-Framing/Rough-in3/13/20083/13/20083/13/2008PPART
DetailsDave Hannah
jerry - partial Phone #: ###-#### new trusses and new soffit on ext
BLD-Wall cover3/5/20083/5/20083/5/2008PPART
DetailsDave Hannah
Jerry; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt first layer of sheet rock ok ok to install second lay ceiling under elevator control room
BLD-Wall cover2/25/20082/25/20082/25/2008PPART
DetailsTony Young
Jerry; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
basement class rooms ok to cover,, 1st layer under mech room in kitchen ceiling ok
BLD-Framing/Rough-in2/13/20082/14/20082/14/2008APART
DetailsTom Arcoraci
jerry Phone #: ###-#### ok to dry in roof
BLD-Footing12/19/200712/20/200712/20/2007APART
DetailsTony Young
jerry Phone #: ###-####
ok pending special inspection report
BLD-Conference12/10/200712/10/200712/10/2007PPART
DetailsTony Young
jerry Phone #: ###-#### Note: Please call 1/2 hr prior to inspection ;
? about re-desihning ADA restrooms due to unforseen structural elements,,, ok,, need to show plan review for approval and record keeping