BLD-Final | 10/20/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are passed.
|
BLD-Final | 9/11/2009 | 9/14/2009 | 9/14/2009 | A | PART |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Final | 9/10/2009 | 9/11/2009 | 9/11/2009 | P | DEFR |
Jim Storey
|
|
|
john Phone #: ###-#### out of time.
|
FIRE-Final Inspection | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PART |
Troy Cobbley
|
|
|
The life safety is passed in the first floor shower room and isolation room.
|
FIRE-Sprinkler Rough-in | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs addressed prior to life safety. I did have the emergency light in the shower room tested while I was waiting for the fire alarm contractor. Will need to be rescheduled.
|
BLD-Other | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Jim Sly
|
|
|
John- fire wall Phone #: ###-#### Existing holes in existing CMU wall filled in with dry pack mortar.......Room 325
|
BLD-Framing/Rough-in | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PART |
Jim Sly
|
|
|
john Phone #: ###-#### Grid...Day room and Isolation Rm ...OK. Frame....S-2 Storage and S-41 Toilet Rm....OK
|
BLD-Framing/Rough-in | 8/20/2009 | 8/21/2009 | 8/21/2009 | A | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####. 1st and 2nd. floor patient room seperation walls ok.
|
BLD-Framing/Rough-in | 8/20/2009 | 8/20/2009 | 8/20/2009 | P | NR |
Tony Young
|
|
|
Ben Phone #: ###-#### need elec 1st
|
BLD-Framing/Rough-in | 8/13/2009 | 8/14/2009 | 8/14/2009 | A | PASS |
Jim Storey
|
|
|
ben Phone #: ###-#### 1 st floor 2 hr wall ok to cover rm and fur out.
|
BLD-Framing/Rough-in | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | FAIL |
Jim Storey
|
|
|
Ben Phone #: ###-#### maintane 2hr wall assembly.
|
BLD-Final | 6/30/2009 | 7/1/2009 | 7/1/2009 | P | PART |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
FIRE-Final Inspection | 6/30/2009 | 7/1/2009 | 7/1/2009 | P | PART |
Troy Cobbley
|
|
|
Emergency lighting has been provided in the second floor, skilled nursing shower. Life safety in this area is passed.
|
FIRE-Final Inspection | 6/30/2009 | 6/30/2009 | 6/30/2009 | P | PART |
Troy Cobbley
|
|
|
Life safety is complete in the Area B of Skilled Nursing. Emergency lighting is required in the new shower rooms on the second floor of skilled nursing prior to occupnancy of the shower room.
|
BLD-Framing/Rough-in | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | PEND |
Tom Arcoraci
|
|
|
Ben-ceiling grid inspection please Phone #: ###-####
|
FIRE-Final Inspection | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for Area B skilled nursing (1st and 2nd floors). The project related fire alarm permit for this area needs to be completed which includes the installation of the door release at the nurse's station. Provide white background for signage on doors. Provide emergency lighting above signed delayed egress doors. Per Dan Stuart, resubmittals are required showing delayed egress locks being installed in this area.
|
BLD-Framing/Rough-in | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | PASS |
Tom Arcoraci
|
|
|
ben - ceiling grid Phone #: ###-####
|
BLD-Final | 6/5/2009 | 6/5/2009 | 6/5/2009 | P | PART |
Tom Arcoraci
|
|
|
ben Phone #: ###-####
|
FIRE-Final Inspection | 6/4/2009 | 6/5/2009 | 6/5/2009 | A | PART |
Troy Cobbley
|
|
|
The life safety passed on first floor skilled nursing/entry way and associated rooms and the second floor activities area directly above it.
|
FIRE-Final Inspection | 6/2/2009 | 6/3/2009 | 6/3/2009 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was for two new entry areas Emergency lighting is required in the exit way. Atleast one fire extinguisher is required as discussed. An exit sign leading to the exit way is missing. The project related fire alarm for this area had issues as well See the city approved fire alarm plans for deficiancies. They include smoke detector and a door holder that are not shown on the plans. A door holder that is shown on the plans but has not been installed. A remote annunciator that has not been installed. A smoke detector that does not set off the general alarm. A room missing a strobe. A wall mount a/v has been revised to a ceiling mount and was the wrong candella. All of these items are in a very small area.
|
FIRE-Final Inspection | 6/1/2009 | 6/2/2009 | 6/2/2009 | A | CANC |
Troy Cobbley
|
|
|
ben Phone #: ###-####
|
BLD-Framing/Rough-in | 5/13/2009 | 5/14/2009 | 5/14/2009 | A | PASS |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
BLD-Framing/Rough-in | 4/14/2009 | 4/15/2009 | 4/15/2009 | A | PASS |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
BLD-Other | 3/13/2009 | 3/16/2009 | 3/16/2009 | A | PASS |
Tom Arcoraci
|
|
|
ceiling grid inspection//ben ###-####
|
BLD-Other | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | PASS |
Tom Arcoraci
|
|
|
John- ceiling grid Phone #: ###-####
|
BLD-Wall cover | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | PART |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 3/2/2009 | 3/3/2009 | 3/3/2009 | A | PASS |
Tom Arcoraci
|
|
|
ben Phone #: ###-#### wip ok
|
BLD-Final | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PART |
Tom Arcoraci
|
|
|
Ben- temp Phone #: ###-####
|
FIRE-Final Inspection | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PART |
Troy Cobbley
|
|
|
The first and second floor dining areas are ok to occupy. The second floor nurses station is ok to occupy.
|
FIRE-Final Inspection | 2/23/2009 | 2/24/2009 | 2/24/2009 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs addressed. There are missing emergency lights in the second floor dining area and one addition light is needed see plan for location. The exit sign infront of the second floor stair access did not operate.
|
BLD-Other | 2/11/2009 | 2/11/2009 | 2/11/2009 | P | PART |
Tom Arcoraci
|
|
|
John Phone #: ###-#### wip ok
|
BLD-Other | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Tom Arcoraci
|
|
|
Brian-Inspection for steel beams & fire proofing please Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-#### wip 2nd floor ok
|
BLD-Other | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/2/2008 at 4:23:53 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Other | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | PASS |
Jim Storey
|
|
|
temp stair encloser ok for use.
|
BLD-Other | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | FAIL |
Mike Jordan
|
|
|
john - temp egress Phone #: ###-####. Still lacking onr rated door to complete exit corridor. Can not continue until door is in place.
|
BLD-Framing/Rough-in | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | PART |
Mike Jordan
|
|
|
Framing for new parapet. wip.
|
BLD-Energy code compliance | 9/10/2008 | 9/16/2008 | 9/16/2008 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 9/5/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Mike Jordan
|
|
|
Framing for new parapet.
|
BLD-Framing/Rough-in | 9/3/2008 | 9/5/2008 | 9/5/2008 | P | PART |
Mike Jordan
|
|
|
Framing for new parapet.
|
BLD-Framing/Rough-in | 8/27/2008 | 9/3/2008 | 9/3/2008 | P | PART |
Mike Jordan
|
|
|
Framing for paprpet wall.
|
BLD-Framing/Rough-in | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Trusses for new parapet on existing roof.
|
BLD-Framing/Rough-in | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
BLD-Aging Inspection | 7/18/2008 | 7/18/2008 | 7/18/2008 | | PASS |
Tom Arcoraci
|
|
|
wip
|
BLD-Aging Inspection | 2/28/2008 | 2/28/2008 | 2/28/2008 | | PASS |
Tom Arcoraci
|
|
|
wip ok
|