BLD-Final | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok for perm occ
|
BLD-Final | 8/14/2009 | 8/17/2009 | 8/18/2009 | A | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok for temp occ ok for perm occ after zoning finals
|
FIRE-Final Inspection | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Forrest France
|
|
|
Items on correction notice regarding EM lights and exit signs field verified for completion, remainder of building fire life safety inspection passed, discussed permit finals for two outbuildings.
|
FIRE-Final Inspection | 8/13/2009 | 8/13/2009 | 8/13/2009 | P | NR |
Forrest France
|
|
|
Notified contractor that project related FIR permit for hood suppression must first be finaled prior to fire life safety.
|
FIRE-Final Inspection | 8/4/2009 | 8/4/2009 | 8/4/2009 | P | NR |
Forrest France
|
|
|
Need to final project related FIR hood suppression permit prior to building fire life safety approvals.
|
FIRE-Final Inspection | 7/13/2009 | 7/14/2009 | 7/14/2009 | A | FAIL |
Troy Cobbley
|
|
|
The items needing correctlng for a life safety final include repairing all of the first floor exit signs and emergency lights as circled in red on the city approved plans. None of the second floor exit signs or emergency lights have been tested. All other life safety items are passed.
|
FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 | A | NR |
Forrest France
|
|
|
Contact Russ on site
|
BLD-Other | 5/6/2009 | 5/6/2009 | 5/7/2009 | P | PASS |
Dave Hannah
|
|
|
Ross- ceiling grid Phone #: ###-#### ok to cover ceilings in locker roons
|
BLD-Other | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Dave Hannah
|
|
|
Russ- ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | CANC |
Dave Hannah
|
|
|
russ - ceiling grid Phone #: ###-#### ok to cover
|
BLD-Other | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ceiling hard in locker rooms ok to cover also ceililing grig second floor hallways ok to cover
|
BLD-Other | 3/23/2009 | 3/24/2009 | 3/24/2009 | A | PART |
Dave Hannah
|
|
|
Russ- ceiling grid Phone #: ###-#### ok to cover band rooms and ground level hallways
|
BLD-Other | 3/19/2009 | 3/19/2009 | 3/20/2009 | P | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok to cover ceilings in halls on ground floor
|
BLD-Framing/Rough-in | 3/16/2009 | 3/17/2009 | 3/17/2009 | A | PART |
Dave Hannah
|
|
|
russ - ceiling grid in section C Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 3/5/2009 | 3/6/2009 | 3/6/2009 | P | PASS |
Dave Hannah
|
|
|
Denny Phone #: ###-####
|
BLD-Other | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PART |
Jim Storey
|
|
|
Russ Phone #: ###-#### area c ceilling grid ok fire wall not top of wall and pentrations not complet. no tile in this area.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PART |
Dave Hannah
|
|
|
russ - ceiling grid in area F Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PART |
Dave Hannah
|
|
|
russ - ceiling grid in area F Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 2/13/2009 | 2/17/2009 | 2/17/2009 | A | PART |
Dave Hannah
|
|
|
russ - ceiling grid in area G Phone #: ###-#### ok to cover ceiling
|
BLD-Other | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Dave Hannah
|
|
|
ceiling grid inspection//Russ ###-#### ok to cover ceiling area h
|
BLD-Other | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PART |
Dave Hannah
|
|
|
russ Note: ceiling grid Phone #: ###-#### ok to cover ceiling in class rooms ground floor of areas d and e
|
BLD-Energy code compliance | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Dave Hannah
|
|
|
suspended ceiling grid inspection please-Russ Phone #: ###-#### walls in band and choir room also insulation ok ok to cover
|
BLD-Framing/Rough-in | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Dave Hannah
|
|
|
suspended ceiling grid inspection please-Russ Phone #: ###-#### area d ground floor ok to cover
|
BLD-Energy code compliance | 1/22/2009 | 1/22/2009 | 1/23/2009 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### need to check with arct on walls around cooling tower soffits in caf,ok hard lids in entry ok
|
BLD-Framing/Rough-in | 1/16/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Dave Hannah
|
|
|
denny Phone #: ###-#### hard lids in locker rooms ok to cover. wallup on maz needs stiffeners to high ok to insulate walls in cooling tower
|
BLD-Energy code compliance | 12/30/2008 | 12/31/2008 | 12/31/2008 | A | PASS |
Dave Hannah
|
|
|
russ - admin area Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PART |
Dave Hannah
|
|
|
russ Note: fat grid Phone #: ###-#### hard lid framing on mazzanin
|
BLD-Framing/Rough-in | 12/12/2008 | 12/15/2008 | 12/15/2008 | A | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok to cover hard lid above stag and weight room also ok to insulate ext walls in adm area
|
BLD-Energy code compliance | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to cover libary
|
BLD-Framing/Rough-in | 12/3/2008 | 12/4/2008 | 12/5/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to insulate ext walls in libary
|
BLD-Framing/Rough-in | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PART |
Jim Sly
|
|
|
russ Note: fire lids Phone #: ###-#### OK to cover ceilings at Bandroom, Chior room, and Wrestling room.
|
BLD-Framing/Rough-in | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### 1hr hard lid admen area ok to cover
|
BLD-Framing/Rough-in | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Dave Hannah
|
|
|
Russ- Kitchen and mechanial room Phone #: ###-#### hard lid ceilings ok to cover
|
BLD-Energy code compliance | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Dave Hannah
|
|
|
Russ- areas G & H Phone #: ###-#### ok to cover ext walls second floor
|
BLD-Framing/Rough-in | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### areas g and h ok to insulate
|
BLD-Energy code compliance | 10/24/2008 | 10/27/2008 | 10/27/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to cover walls area d and e and ok to cover ceiling area f
|
BLD-Concrete | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | PART |
Dave Hannah
|
|
|
russ Note: pouring concrete 11:00 am Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PART |
Mike Jordan
|
|
|
RUSS NOTE: 1ST FLOOR CLASSROOM Phone #: ###-####. Interior steel stud framed walls in areas E and D, 1st floor. ok to insul. ardlids in restrooms ok. STILL NEED TO VERIFY TRHU AND MEMBRANE PENETRATIONS AT 2HR WALL.
|
BLD-Concrete | 9/22/2008 | 9/22/2008 | 9/23/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | PART |
Dave Hannah
|
|
|
russ Note: pouring at noon Phone #: ###-####
|
BLD-Concrete | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-####
|
BLD-Concrete | 8/14/2008 | 8/15/2008 | 8/15/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### elev deck ok to place concrete
|
BLD-Concrete | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | NR |
Tom Arcoraci
|
|
|
russ - pouring at 2:00 Phone #: ###-#### wip ok
|
BLD-Concrete | 7/15/2008 | 7/15/2008 | 7/16/2008 | P | PART |
Mike Jordan
|
|
|
russ Phone #: ###-####. 2nd floor pan deck, area E.
|
BLD-Concrete | 6/24/2008 | 6/24/2008 | 6/25/2008 | P | PART |
Dave Hannah
|
|
|
denny - pan deck - rebar Phone #: ###-####ok to place after mti oks
|
BLD-Concrete | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-#### beams ok to pour
|
BLD-Concrete | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PASS |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to place elev slab
|
BLD-Concrete | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Tom Arcoraci
|
|
|
russ - pouring at 1:00 Phone #: ###-#### mti on site
|
BLD-Concrete | 4/15/2008 | 4/16/2008 | 4/16/2008 | A | PART |
Dave Hannah
|
|
|
russ - stem walls Phone #: ###-####
|
BLD-Concrete | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PART |
Dave Hannah
|
|
|
russ -pouring at 3:00 Phone #: ###-####
|
BLD-Concrete | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Jim Storey
|
|
|
russ - pourng at 2:00 Phone #: ###-####placed with si observation pending reports.
|
BLD-Concrete | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-####
|
BLD-Concrete | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 3/13/2008 | 3/14/2008 | 3/14/2008 | A | PART |
Dave Hannah
|
|
|
Russ, ppouring concrete @ 9:00; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Concrete | 3/11/2008 | 3/11/2008 | 3/12/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-#### int ftgs area e mti on site did rebar inspection and are testing concrete
|
BLD-Concrete | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:30 Phone #: ###-####
|
BLD-Concrete | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-####
|
BLD-Other | 2/13/2008 | 2/14/2008 | 2/14/2008 | A | PART |
Dave Hannah
|
|
|
denny Note: pouring concrete at 2:00 - stem wall inspection Phone #: ###-####
|
BLD-Footing | 2/12/2008 | 2/12/2008 | 2/12/2008 | P | PASS |
Jim Storey
|
|
|
Russ-pouring at 2 this afternoon Phone #: ###-#### ft at grid lines 1/lmn ok rebar si on site for testing.
|
BLD-Concrete | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 2/4/2008 | 2/5/2008 | 2/5/2008 | A | PART |
Mike Jordan
|
|
|
Russ Please call first , late AM if possible Phone #: ###-####. stemwall at area E, south and east sides.
|
BLD-Concrete | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Jim Sly
|
|
|
russ - stem wall - pour time is 2:00 pm Phone #: ###-#### Cancelled....til Tuesday
|
BLD-Footing | 1/29/2008 | 1/30/2008 | 1/31/2008 | A | PART |
Dave Hannah
|
|
|
russ Note: late morning please - pouring footing at 2:00 pm Phone #: ###-#### second pour on ftgs mti on site inspecting rebar and testing concrete as per spec inspection
|
BLD-Footing | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PART |
Mike Jordan
|
|
|
russ Phone #: ###-####. East perimeter footing, area E. Noted special inspector was on site. Contractor is following cold weather copnc. const. requirements.
|