Permit Information
Permit NumberBLD07-01910
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 5600 E WARM SPRINGS AVE
Project NameEAST JR HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
East Junior High - To construct a new 120,805 square foot, two story, masonry and steel framed junior high school and related site improvements. This building is separated by two hour fire walls into three separate buildings. Section One is Type II One-hour construction and contains the gymnasiums, locker rooms, kitchen and cafeteria and administrative offices on the first floor and library and computer/technology areas on the second floor. The first floor is 50,415 sq. ft. and the second floor is 10,150 sq. ft.. Section Two is Type II nonrated construction and contains classrooms on the first and second floors. First floor 15,275 sq. ft. and second floor 14,450 square feet. Section Three is Type II nonrated construction and contains classrooms on the first and second floors. First floor 15,145 sq. ft. and second floor 15,370 square feet. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/18/20098/18/20098/18/2009PPASS
DetailsDave Hannah
russ Phone #: ###-#### ok for perm occ
BLD-Final8/14/20098/17/20098/18/2009APART
DetailsDave Hannah
Russ Phone #: ###-#### ok for temp occ ok for perm occ after zoning finals
FIRE-Final Inspection8/14/20098/14/20098/14/2009PPASS
DetailsForrest France
Items on correction notice regarding EM lights and exit signs field verified for completion, remainder of building fire life safety inspection passed, discussed permit finals for two outbuildings.
FIRE-Final Inspection8/13/20098/13/20098/13/2009PNR
DetailsForrest France
Notified contractor that project related FIR permit for hood suppression must first be finaled prior to fire life safety.
FIRE-Final Inspection8/4/20098/4/20098/4/2009PNR
DetailsForrest France
Need to final project related FIR hood suppression permit prior to building fire life safety approvals.
FIRE-Final Inspection7/13/20097/14/20097/14/2009AFAIL
DetailsTroy Cobbley
The items needing correctlng for a life safety final include repairing all of the first floor exit signs and emergency lights as circled in red on the city approved plans. None of the second floor exit signs or emergency lights have been tested. All other life safety items are passed.
FIRE-Final Inspection6/5/20096/5/20096/5/2009ANR
DetailsForrest France
Contact Russ on site
BLD-Other5/6/20095/6/20095/7/2009PPASS
DetailsDave Hannah
Ross- ceiling grid Phone #: ###-#### ok to cover ceilings in locker roons
BLD-Other4/22/20094/22/20094/22/2009PPASS
DetailsDave Hannah
Russ- ceiling grid Phone #: ###-####
BLD-Framing/Rough-in4/13/20094/13/20094/13/2009PCANC
DetailsDave Hannah
russ - ceiling grid Phone #: ###-#### ok to cover
BLD-Other3/31/20094/1/20094/1/2009APART
DetailsDave Hannah
Russ Phone #: ###-#### ceiling hard in locker rooms ok to cover also ceililing grig second floor hallways ok to cover
BLD-Other3/23/20093/24/20093/24/2009APART
DetailsDave Hannah
Russ- ceiling grid Phone #: ###-#### ok to cover band rooms and ground level hallways
BLD-Other3/19/20093/19/20093/20/2009PPART
DetailsDave Hannah
Russ Phone #: ###-#### ok to cover ceilings in halls on ground floor
BLD-Framing/Rough-in3/16/20093/17/20093/17/2009APART
DetailsDave Hannah
russ - ceiling grid in section C Phone #: ###-#### ok to cover ceiling
BLD-Framing/Rough-in3/5/20093/6/20093/6/2009PPASS
DetailsDave Hannah
Denny Phone #: ###-####
BLD-Other3/4/20093/4/20093/4/2009PPART
DetailsJim Storey
Russ Phone #: ###-#### area c ceilling grid ok fire wall not top of wall and pentrations not complet. no tile in this area.
BLD-Framing/Rough-in2/24/20092/24/20092/24/2009PPART
DetailsDave Hannah
russ - ceiling grid in area F Phone #: ###-#### ok to cover ceiling
BLD-Framing/Rough-in2/19/20092/20/20092/20/2009APART
DetailsDave Hannah
russ - ceiling grid in area F Phone #: ###-#### ok to cover
BLD-Framing/Rough-in2/13/20092/17/20092/17/2009APART
DetailsDave Hannah
russ - ceiling grid in area G Phone #: ###-#### ok to cover ceiling
BLD-Other2/10/20092/10/20092/10/2009PPART
DetailsDave Hannah
ceiling grid inspection//Russ ###-#### ok to cover ceiling area h
BLD-Other2/3/20092/3/20092/3/2009PPART
DetailsDave Hannah
russ Note: ceiling grid Phone #: ###-#### ok to cover ceiling in class rooms ground floor of areas d and e
BLD-Energy code compliance1/29/20091/30/20091/30/2009APART
DetailsDave Hannah
suspended ceiling grid inspection please-Russ Phone #: ###-#### walls in band and choir room also insulation ok ok to cover
BLD-Framing/Rough-in1/29/20091/30/20091/30/2009APART
DetailsDave Hannah
suspended ceiling grid inspection please-Russ Phone #: ###-#### area d ground floor ok to cover
BLD-Energy code compliance1/22/20091/22/20091/23/2009PPART
DetailsDave Hannah
russ Phone #: ###-#### need to check with arct on walls around cooling tower soffits in caf,ok hard lids in entry ok
BLD-Framing/Rough-in1/16/20091/20/20091/20/2009APART
DetailsDave Hannah
denny Phone #: ###-#### hard lids in locker rooms ok to cover. wallup on maz needs stiffeners to high ok to insulate walls in cooling tower
BLD-Energy code compliance12/30/200812/31/200812/31/2008APASS
DetailsDave Hannah
russ - admin area Phone #: ###-#### ok to cover
BLD-Framing/Rough-in12/29/200812/29/200812/29/2008PPART
DetailsDave Hannah
russ Note: fat grid Phone #: ###-#### hard lid framing on mazzanin
BLD-Framing/Rough-in12/12/200812/15/200812/15/2008APART
DetailsDave Hannah
Russ Phone #: ###-#### ok to cover hard lid above stag and weight room also ok to insulate ext walls in adm area
BLD-Energy code compliance12/8/200812/8/200812/8/2008PPART
DetailsDave Hannah
russ Phone #: ###-#### ok to cover libary
BLD-Framing/Rough-in12/3/200812/4/200812/5/2008APART
DetailsDave Hannah
russ Phone #: ###-#### ok to insulate ext walls in libary
BLD-Framing/Rough-in11/24/200811/25/200811/25/2008APART
DetailsJim Sly
russ Note: fire lids Phone #: ###-####
OK to cover ceilings at Bandroom, Chior room, and Wrestling room.
BLD-Framing/Rough-in11/19/200811/19/200811/19/2008PPART
DetailsDave Hannah
russ Phone #: ###-#### 1hr hard lid admen area ok to cover
BLD-Framing/Rough-in11/10/200811/10/200811/10/2008PPART
DetailsDave Hannah
Russ- Kitchen and mechanial room Phone #: ###-#### hard lid ceilings ok to cover
BLD-Energy code compliance11/10/200811/10/200811/10/2008PPART
DetailsDave Hannah
Russ- areas G & H Phone #: ###-#### ok to cover ext walls second floor
BLD-Framing/Rough-in10/28/200810/29/200810/29/2008APART
DetailsDave Hannah
russ Phone #: ###-#### areas g and h ok to insulate
BLD-Energy code compliance10/24/200810/27/200810/27/2008APART
DetailsDave Hannah
russ Phone #: ###-#### ok to cover walls area d and e and ok to cover ceiling area f
BLD-Concrete10/20/200810/21/200810/21/2008APART
DetailsDave Hannah
russ Note: pouring concrete 11:00 am Phone #: ###-####
BLD-Framing/Rough-in9/25/20089/26/20089/26/2008APART
DetailsMike Jordan
RUSS NOTE: 1ST FLOOR CLASSROOM Phone #: ###-####. Interior steel stud framed walls in areas E and D, 1st floor. ok to insul. ardlids in restrooms ok. STILL NEED TO VERIFY TRHU AND MEMBRANE PENETRATIONS AT 2HR WALL.
BLD-Concrete9/22/20089/22/20089/23/2008PPART
DetailsDave Hannah
russ Phone #: ###-####
BLD-Concrete9/17/20089/18/20089/18/2008APART
DetailsDave Hannah
russ Note: pouring at noon Phone #: ###-####
BLD-Concrete9/4/20089/4/20089/4/2008PPART
DetailsDave Hannah
Russ Phone #: ###-####
BLD-Concrete8/14/20088/15/20088/15/2008APART
DetailsDave Hannah
russ Phone #: ###-#### elev deck ok to place concrete
BLD-Concrete7/25/20087/25/20087/25/2008PNR
DetailsTom Arcoraci
russ - pouring at 2:00 Phone #: ###-#### wip ok
BLD-Concrete7/15/20087/15/20087/16/2008PPART
DetailsMike Jordan
russ Phone #: ###-####. 2nd floor pan deck, area E.
BLD-Concrete6/24/20086/24/20086/25/2008PPART
DetailsDave Hannah
denny - pan deck - rebar Phone #: ###-####ok to place after mti oks
BLD-Concrete6/11/20086/11/20086/11/2008PPART
DetailsDave Hannah
russ - pouring at 2:00 Phone #: ###-#### beams ok to pour
BLD-Concrete6/9/20086/9/20086/9/2008PPASS
DetailsDave Hannah
russ Phone #: ###-#### ok to place elev slab
BLD-Concrete5/23/20085/23/20085/23/2008PPART
DetailsTom Arcoraci
russ - pouring at 1:00 Phone #: ###-#### mti on site
BLD-Concrete4/15/20084/16/20084/16/2008APART
DetailsDave Hannah
russ - stem walls Phone #: ###-####
BLD-Concrete4/8/20084/8/20084/8/2008PPART
DetailsDave Hannah
russ -pouring at 3:00 Phone #: ###-####
BLD-Concrete4/1/20084/2/20084/2/2008APART
DetailsDave Hannah
russ Phone #: ###-####
BLD-Concrete3/26/20083/27/20083/27/2008PPASS
DetailsJim Storey
russ - pourng at 2:00 Phone #: ###-####placed with si observation pending reports.
BLD-Concrete3/20/20083/20/20083/20/2008PPART
DetailsDave Hannah
russ - pouring at 2:00 Phone #: ###-####
BLD-Concrete3/18/20083/18/20083/18/2008PPART
DetailsDave Hannah
russ Phone #: ###-####
BLD-Concrete3/13/20083/14/20083/14/2008APART
DetailsDave Hannah
Russ, ppouring concrete @ 9:00; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Concrete3/11/20083/11/20083/12/2008PPART
DetailsDave Hannah
russ - pouring at 2:00 Phone #: ###-#### int ftgs area e mti on site did rebar inspection and are testing concrete
BLD-Concrete2/27/20082/27/20082/27/2008PPART
DetailsDave Hannah
russ - pouring at 2:30 Phone #: ###-####
BLD-Concrete2/20/20082/20/20082/20/2008PPART
DetailsDave Hannah
russ - pouring at 2:00 Phone #: ###-####
BLD-Other2/13/20082/14/20082/14/2008APART
DetailsDave Hannah
denny Note: pouring concrete at 2:00 - stem wall inspection Phone #: ###-####
BLD-Footing2/12/20082/12/20082/12/2008PPASS
DetailsJim Storey
Russ-pouring at 2 this afternoon Phone #: ###-#### ft at grid lines 1/lmn ok rebar si on site for testing.
BLD-Concrete2/7/20082/8/20082/8/2008APART
DetailsDave Hannah
russ Phone #: ###-####
BLD-Concrete2/4/20082/5/20082/5/2008APART
DetailsMike Jordan
Russ Please call first , late AM if possible Phone #: ###-####. stemwall at area E, south and east sides.
BLD-Concrete2/4/20082/4/20082/4/2008PCANC
DetailsJim Sly
russ - stem wall - pour time is 2:00 pm Phone #: ###-####
Cancelled....til Tuesday
BLD-Footing1/29/20081/30/20081/31/2008APART
DetailsDave Hannah
russ Note: late morning please - pouring footing at 2:00 pm Phone #: ###-#### second pour on ftgs mti on site inspecting rebar and testing concrete as per spec inspection
BLD-Footing1/22/20081/23/20081/23/2008APART
DetailsMike Jordan
russ Phone #: ###-####. East perimeter footing, area E. Noted special inspector was on site. Contractor is following cold weather copnc. const. requirements.