BLD-Final | 5/13/2008 | 5/14/2008 | 5/13/2008 | A | PASS |
Dave Hannah
|
|
|
scott Phone #: ###-####
|
DOC - Permit Finaled | 5/13/2008 | 5/13/2008 | 5/13/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/9/2008 | 5/12/2008 | 5/12/2008 | P | FAIL |
Dave Hannah
|
|
|
scott Phone #: ###-#### needs mec final needs to finish grading around house tempered glass by doors and tub hand rail front steps gaurd rail back porch by window well spendal at top of stairs
|
BLD-Final | 5/8/2008 | 5/9/2008 | 5/10/2008 | P | FAIL |
Dave Hannah
|
|
|
scott Phone #: ###-#### needs other trades to sign off
|
BLD-Foundation | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
Dave Hannah
|
|
|
jerod Phone #: ###-####
|
BLD-Footing | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PART |
Dave Hannah
|
|
|
scott Phone #: ###-#### garage ok to pour
|
BLD-Energy code compliance | 2/1/2008 | 2/4/2008 | 2/4/2008 | A | PASS |
Dave Hannah
|
|
|
scott - insulation Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 1/11/2008 | 1/14/2008 | 1/14/2008 | A | PART |
Dave Hannah
|
|
|
scott Phone #: ###-#### still needs seal package installed
|
BLD-Framing/Rough-in | 1/7/2008 | 1/8/2008 | 1/8/2008 | P | FAIL |
Jim Sly
|
|
|
scott Phone #: ###-#### C/N posted
|
BLD-Footing | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
Dave Hannah
|
|
|
jerod Phone #: ###-####
|
BLD-Foundation | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PART |
Dave Hannah
|
|
|
jared Phone #: ###-#### basement wall ok to pour
|
BLD-Footing | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PART |
Dave Hannah
|
|
|
gerald Phone #: ###-#### basement ftg
|