BLD-Final | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Dave Hannah
|
|
|
steve Phone #: ###-#### ok for perm occ mec is ok they will final out permit elec will also final out premit
|
FIRE-Final Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety final passed per site inspection completed by K. Roule, corrections are complete.
|
FIRE-Supply Line Hydro | 10/29/2007 | 10/30/2007 | 10/30/2007 | A | DEFR |
Forrest France
|
|
|
Inspection intended for a life safety final.
|
BLD-Final | 10/26/2007 | 10/29/2007 | 10/29/2007 | A | NR |
Dave Hannah
|
|
|
steve Phone #: ###-#### needs fire final
|
FIRE-Final Inspection | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | FAIL |
Forrest France
|
|
|
Need approved plans on site for review, exit sign at the main entry/exit door did not function on battery backup, need to test EM lighting.
|
BLD-Framing/Rough-in | 10/12/2007 | 10/12/2007 | 10/15/2007 | P | PASS |
Dave Hannah
|
|
|
mario Phone #: ###-####
|
BLD-Framing/Rough-in | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PART |
Dave Hannah
|
|
|
Mario; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover door
|
BLD-Conference | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | PASS |
Dave Hannah
|
|
|
9:00am please Field Plan Review
|