BLD-Final | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Final | 10/20/2009 | 10/21/2009 | 10/20/2009 | A | PASS |
Jim Sly
|
|
|
bryan Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 10/5/2009 | 10/6/2009 | 10/6/2009 | A | FAIL |
Troy Cobbley
|
|
|
The occupant load signs have been mounted and the exit signs, emergency lighting and exit discharge lighting have been verified for functionality. One emergency light and one exit sign need repaired as discussed. See the 10/5/2009 entry for other items needing addressed prior to a final sign off. The relocation of the generator is ok per scott and the fire alarm panel can provide supervision of the primary power at the horizontal sliding doors per Jason Blaise.
|
FIRE-Final Inspection | 10/1/2009 | 10/5/2009 | 10/5/2009 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
|
BLD-Final | 9/17/2009 | 9/18/2009 | 9/18/2009 | A | PEND |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection of all rooms except Electr and Elevator..........OK. Verified by (2) letters that (2) approx 5-0x6-0 windows at North side of bldg ....adjacent to double doors are Tempered units. Jambs are covering etching. The Manufacturer...... General glass Co. Portland Ore. ###-#### Work order # 039680 verified glass mentioned above was Tempered. Mid Valley Glass Eugene Ore. ###-#### 9/17/09 Was window Contractor.....Doug Jordon ###-#### was in charge and provided letter mentioned above.
|
BLD-Other | 9/10/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Jim Storey
|
|
|
Drop ceiling grid inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Other | 8/24/2009 | 8/25/2009 | 8/25/2009 | A | NR |
Jim Sly
|
|
|
suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Energy code compliance | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Jim Sly
|
|
|
Rockwool insulation in mechanical room Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Energy code compliance | 7/6/2009 | 7/7/2009 | 7/7/2009 | A | PASS |
Jim Sly
|
|
|
Remaining insulation 1st floor. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Energy code compliance | 7/1/2009 | 7/2/2009 | 7/2/2009 | A | PASS |
Jim Sly
|
|
|
dining room insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Wall cover | 6/30/2009 | 7/1/2009 | 7/1/2009 | P | PASS |
Jim Sly
|
|
|
Kitchen sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Energy code compliance | 6/29/2009 | 6/30/2009 | 6/30/2009 | A | PASS |
Jim Sly
|
|
|
kitchen insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 6/24/2009 | 6/25/2009 | 6/25/2009 | A | PASS |
Jim Sly
|
|
|
commercial kitchen fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 6/23/2009 | 6/24/2009 | 6/24/2009 | A | PART |
Jim Sly
|
|
|
1st floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb All OK...... except Kitchen.
|
BLD-Energy code compliance | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | PASS |
Jim Sly
|
|
|
2nd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Energy code compliance | 6/22/2009 | 6/24/2009 | 6/22/2009 | A | CANC |
Jim Sly
|
|
|
2nd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
|
BLD-Wall cover | 6/19/2009 | 6/22/2009 | 6/22/2009 | A | PASS |
Jim Sly
|
|
|
3rd floor sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 6/17/2009 | 6/19/2009 | 6/18/2009 | P | CANC |
Jim Sly
|
|
|
1st floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
|
BLD-Energy code compliance | 6/15/2009 | 6/16/2009 | 6/16/2009 | P | PASS |
Jim Sly
|
|
|
3rd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 6/15/2009 | 6/16/2009 | 6/16/2009 | P | PASS |
Jim Sly
|
|
|
2nd floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 6/11/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Jim Sly
|
|
|
3rd floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 6/5/2009 | 6/5/2009 | 6/5/2009 | P | PART |
Jim Sly
|
|
|
elevator shaft Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Wall cover | 6/3/2009 | 6/4/2009 | 6/4/2009 | P | PASS |
Jim Sly
|
|
|
sheet rock nailing in hallways on all three floors. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Wall cover | 6/3/2009 | 6/5/2009 | 6/3/2009 | A | CANC |
Jim Sly
|
|
|
hallway sheet rock nailing 1st, 2nd and 3rd floors. Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
|
BLD-Energy code compliance | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | PASS |
Jim Sly
|
|
|
hallway ceiling insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 5/26/2009 | 5/27/2009 | 5/27/2009 | P | PASS |
Jim Sly
|
|
|
1st floor hallway inspection to pre-rock Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 5/15/2009 | 5/15/2009 | 5/15/2009 | P | PASS |
Jim Sly
|
|
|
inspection for pre rock 2nd and 3rd floor around atrium area Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Framing/Rough-in | 2/26/2009 | 3/2/2009 | 3/2/2009 | P | PART |
Jim Sly
|
|
|
A wing int and ext shear inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb Above items inspected and OK'd
|
BLD-Framing/Rough-in | 2/26/2009 | 2/27/2009 | 2/27/2009 | A | PART |
Jim Sly
|
|
|
A wing roof. Phone #: ###-#### Internet Inspection Request from: Bryan Herb "A" wing Roof nailing OK.
|
BLD-Concrete | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | DEFR |
Mike Jordan
|
|
|
MTI scheduled as well for inspection at 3pm for rebar in interior footings Phone #: ###-#### Internet Inspection Request from: Bryan Herb. Conc already placed. Noted special insp.
|
BLD-Foundation | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PART |
Jim Sly
|
|
|
elevator walls and porte cachere footings Phone #: ###-#### Internet Inspection Request from: Bryan Herb OK Pend MTI special insp tests and appr.
|
BLD-Energy code compliance | 10/8/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Jim Sly
|
|
|
Foundation insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD-Foundation | 10/2/2008 | 10/6/2008 | 10/6/2008 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan Herb W. sect of south wall and E. section of North wall OK pending special insp tests and approvals.
|
BLD-Footing | 9/29/2008 | 10/1/2008 | 10/1/2008 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan North and South wall footings OK pending MTI special insp, tests and approvals.
|