BLD-Final | 6/10/2009 | 6/10/2009 | 6/11/2009 | P | PASS |
Jim Storey
|
|
|
Please call at least a half hour prior for access meeting-Harry Phone #: ###-####
|
DOC - Permit Finaled | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 6/8/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Forrest France
|
|
|
Shell building fire life safety inspection passed, no inspection record on site for signature, additional address numbers to be posted at the east side of the structure per discussion.
|
BLD-Aging Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 | | PART |
Jim Storey
|
|
|
will call for final 6/8/09
|
BLD-Aging Inspection | 3/23/2009 | 3/23/2009 | 3/24/2009 | P | PART |
Forrest France
|
|
|
Project related fire alarm permit has been finaled, need fire life safety inspection prior to building final.
|
BLD-Aging Inspection | 3/23/2009 | 3/23/2009 | 3/23/2009 | | DEFR |
Jim Storey
|
|
|
talked with eric at stock const. to call for p&z final insp.
|
BLD-Aging Inspection | 1/19/2009 | 1/19/2009 | 1/20/2009 | | NR |
Jim Storey
|
|
|
pending p&z activity in note field. no requist for final on bld
|
FIRE-Final Inspection | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | NR |
Forrest France
|
|
|
Need project related fire alarm permit final prior to building fire life safety approval.
|
BLD-Aging Inspection | 9/12/2008 | 9/12/2008 | 9/12/2008 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Other | 7/3/2008 | 7/7/2008 | 7/7/2008 | A | PART |
Jim Storey
|
|
|
harry Note: ceiling grid Phone #: ###-####
|
BLD-Conference | 6/25/2008 | 6/25/2008 | 6/25/2008 | P | PASS |
Jim Storey
|
|
|
harry Phone #: ###-####
|
BLD-Framing/Rough-in | 6/12/2008 | 6/13/2008 | 6/13/2008 | A | PASS |
Jim Storey
|
|
|
Harry; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt 2nd floor ok to cover.
|
BLD-Framing/Rough-in | 6/5/2008 | 6/5/2008 | 6/5/2008 | P | PASS |
Jim Storey
|
|
|
perry Phone #: ###-#### first floor ok to cover.
|
BLD-Framing/Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | PART |
Tom Arcoraci
|
|
|
harry Phone #: ###-#### int shear ok for one sde cover
|
BLD-Framing/Rough-in | 5/8/2008 | 5/12/2008 | 5/12/2008 | A | PART |
Jim Storey
|
|
|
mitch Phone #: ###-#### rfi to engineer for sheer wall edge blk or not for screw sch./ verrifcation of pin only for sheer wall interior shot pin only/ bolts still need tightened before 2 nd floor concrete is to be placed/
|
BLD-Footing | 1/8/2008 | 1/9/2008 | 1/9/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/8/2008 at 3:31:42 PM. Contact: ###-####. center pad ft and rebar mats ok pending si testing of the concrete.
|
FIRE-Supply Line Hydro | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | CANC |
Forrest France
|
|
|
Incorrect inspection type, was intended for the plumbing permit work.
|
BLD-Footing | 12/3/2007 | 12/4/2007 | 12/4/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/3/2007 at 4:03:23 PM. Contact: ###-####.
|
BLD-Footing | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/28/2007 at 12:34:12 PM. Contact: ###-####. if possible mid-morning north ft ok
|
BLD-Footing | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | PASS |
Jim Storey
|
|
|
Note: If possible MID MORNING Scheduled by a contractor via Hello! on 11/27/2007 at 12:09:17 PM. Contact: ###-####. south side ok ft
|