Permit Information
Permit NumberBLD07-02123
StatusFinaled
Name PETRA INC
Site Address 930 N CLOVERDALE RD
Project NameIDAHO KOREAN PRESBYTERIAN CHUR
Customer Number 
ePlanReviewNo
Description
(Idaho Korean Presbyterian Church - Addition) PLAN MODIFICATION 11/10/08 - TO DELETE THE 200 SQ. FT. WARMING KITCHEN INDICATED ON ORIGINAL APPROVED PLANS AS ROOM 114 AND USE THE 200 SQ. FOOT AREA AS A STORAGE ROOM PER RESUBMITTAL SHEET A3.1. DELETES DETAILS 2 & 3/A-3.1. drs. To add approxamately 5,530 square feet of additional floor area to an existing 1,840 square feet, A-3, assembly building. Work included in this permit is to add three new educational class rooms, a 3,600 square feet sanctuary with fixed seating, construction of two new accessible restrooms, and a 200 square feet warming kitchen. NOTE: A two hour fire barrier will be used to separate the A-3 fire areas and maintain a occupant load below three hundred. All construction shall be per the approved plans and attached comment list. MJP CUP07-0008
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/200812/11/200812/11/2008APASS
DetailsMike Jordan
ben Phone #: ###-####. ok for perm occ.
BLD-Conference10/28/200810/29/200810/29/2008PDONE
DetailsMike Jordan
ben Note: appt for conference set at 3:00 pm!!! Phone #: ###-####
BLD-Final10/13/200810/14/200810/14/2008APART
DetailsMike Jordan
ben Phone #: ###-####. Temp occ. was granted. noted that ada requirements for assembly seating and kitchenet have not been installed or the ssistive listening devices.
Code Occupancy Approval  10/10/2008 FAIL
Failed to comply with condition #7 of CUP07-00008. Condition #7 requires landscape buffer of mixed groundcover and evergreens and deciduos shrubs be provided between the south fence and new southern edge of pavement. Recycled asphalt is ok
Called Ben Pearson (###-####) at 15:00 (10-10-08) and expained the requirement of CUP07-00008 condition of approval # 7. He will install two evergreens and two shrubs along the south property line.
FIRE-Final Inspection10/8/200810/10/200810/9/2008APASS
DetailsTroy Cobbley
Corrections made per last inspection. KR
FIRE-Final Inspection10/7/200810/8/200810/8/2008AFAIL
DetailsTroy Cobbley
fire life safety failed. Crash bars not installed per approved plans. KR.
BLD-Wall cover7/28/20087/29/20087/29/2008APASS
DetailsMike Jordan
Ben Phone #: ###-####. Verified all fire stop on thru and membrane penetrations on 2hr. fire barrier wall.
BLD-Other7/22/20087/22/20087/22/2008PPART
DetailsMike Jordan
ben - drywall taping Phone #: ###-####. 2hr. fire barrier wall, final layer, west side. Still need to verify firecaulking on west side.
BLD-Other7/17/20087/18/20087/18/2008APART
DetailsMike Jordan
ben Note:fire wall please call 1/2 hr prior to inspection Phone #: ###-####. 2hr. wall, 2nd layer east side, 1st layer west side.
BLD-Other7/16/20087/16/20087/16/2008PPART
DetailsMike Jordan
ben Note: fire wall Phone #: ###-####. 1st. layer of 2hr. wall, east side only.
BLD-Energy code compliance7/14/20087/15/20087/16/2008APASS
DetailsMike Jordan
ben - exterior insulation Phone #: ###-####
BLD-Framing/Rough-in7/14/20087/14/20087/16/2008PPASS
DetailsMike Jordan
ben Phone #: ###-####. All issues resolved.
BLD-Framing/Rough-in7/10/20087/10/20087/10/2008PPART
DetailsDave Hannah
Ben Phone #: ###-#### ok to insulate still need to see truss engineering strape overcut and under lapped splices in top plates finish rocking 2hr wall and fire cualk pins and flase around fire dampers
BLD-Framing/Rough-in7/9/20087/9/20087/9/2008PNR
DetailsMike Jordan
ben Phone #: ###-####.Needs mech ri insp.
BLD-Wall cover6/5/20086/5/20086/5/2008PPART
DetailsMike Jordan
Ben Phone #: ###-####. 2nd layer of 2hr. wall at attic only.
BLD-Wall cover6/2/20086/2/20086/2/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/2/2008 at 8:32:50 AM. Contact: ###-####. 1st layer of 2hr firewall at attic area only.
BLD-Other5/28/20085/28/20085/28/2008PPART
DetailsMike Jordan
ben note: fire wall Phone #: ###-####
FIRE-Final Inspection5/28/20085/28/20085/28/2008PCANC
DetailsTroy Cobbley
ben Note: fire wall Phone #: ###-####
BLD-Other5/9/20085/12/20085/12/2008APART
DetailsMike Jordan
Ben, exterior wall sheathing; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Exterior shear nail only.
BLD-Other5/7/20085/8/20085/8/2008PPART
DetailsMike Jordan
ben - exterior sheeting shear Phone #: ###-####. Shear nail for roof diaphragm.
BLD-Other4/7/20084/7/20084/7/2008PNR
DetailsMike Jordan
ben - prep for slab on grade Phone #: ###-####. wire mesh not yet in place, comnc. will hacve special insp, messh will be verified by special insp.
BLD-Footing1/28/20081/29/20081/29/2008APART
DetailsMike Jordan
ben - rebar Phone #: ###-####. wip. Perimeter stemwalls ok. Installing reinforcement at attachement to existing bldg. ok for conc. pend. approval of special insp. conc. placement cancelled for today.
BLD-Footing1/24/20081/25/20081/25/2008ACANC
DetailsJim Sly
ben Phone #: ###-####
Special insp required........OK pending Geotech special inspections, tests, and approvals.