Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-02303
StatusFinaled
Name TALON CONSTRUCTION
Site Address 2700 W AIRPORT WAY
Project NameROCKY MTN MGMT ADDITION
Customer Number 
ePlanReviewNo
Description
(F&C Corporation - Rocky Mountain Management & Development)(Addition and Remodel) - To construct a total of 1,350 square feet of one story, wood framed additions on to an existing 4,700 square foot, one story office building. There will be a 283 square foot, office addition on the east side of the building and a 1,067 square foot, one story office addition at the south side of the existing building. This permit also includes some demo and remodel of several areas within the existing building. The original building was constructed under ID-41553. (FICHE # 970114) All construction per the approved plans and attached comment list. NOTE: This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval4/8/20084/8/20084/8/2008PPASS
DetailsDena Gambrel
Code Occupancy Approval Temp3/11/20083/11/20083/11/2008PPASS
DetailsDena Gambrel
3-11-08 1400 TEMP ONLY. Need an updated landscape plan submitted and approved for the changes in grass areas and plants used. Need to stripe one more parking area for handicape parking, install the above ground handicape sign, and install two wheel stops in the handicape parking area.
BLD-Aging Inspection3/4/20083/4/20083/4/2008 PASS
DetailsJim Storey
card was on site at last insp.all signed for perm.
BLD-Final12/20/200712/20/200712/20/2007PPASS
DetailsJim Storey
henry Phone #: ###-####
FIRE-Final Inspection12/17/200712/17/200712/18/2007PPASS
DetailsForrest France
Life safety inspection passed.
FIRE-Final Inspection12/12/200712/14/200712/14/2007PNR
DetailsForrest France
Not ready...KR
BLD-Other12/13/200712/13/200712/13/2007PPASS
DetailsJim Storey
ceilling ok
BLD-Framing/Rough-in12/12/200712/13/200712/13/2007ACANC
DetailsJim Storey
henry - ceiling Phone #: ###-#### called and wanted to be rolled to pm
BLD-Energy code compliance11/19/200711/19/200711/19/2007PPASS
DetailsJim Storey
henry - insulation Phone #: ###-####
BLD-Framing/Rough-in11/8/200711/9/200711/9/2007PPASS
DetailsJim Storey
Scott at ###-####
BLD-Other11/1/200711/2/200711/2/2007PPASS
DetailsJim Storey
exterior wall sheeting/nailing inspection please--henry; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt exterior sheer nailling ok to cover.
BLD-Foundation10/18/200710/18/200710/18/2007PPASS
DetailsJim Storey
henry Phone #: ###-####
BLD-Footing10/15/200710/16/200710/16/2007APASS
DetailsJim Storey
henry Phone #: ###-#### ft ok epoxy ok with si. si to cover concrete insp,