Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-02307
StatusFinaled
Name K2 CONSTRUCTION
Site Address 4600 S APPLE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(MOTIVE POWER) To remodel the interior of an existing 4,890 sq.ft. office / restroom area with minor exterior remodel associated with an existing industrial site per approved plans. To perform selective interior demolition; construct interior non-combustible frame walls to create relocated training rooms, private office, break/work area and open office for 42 new built in desks; infill existing openings in perimeter walls and add 4 new 5' x 2' windows in north wall; upgrade doors, landings and hardware to comply for accessibility; to upgrade existing restrooms for accessibility by enlarging the Womens restroom to add a second water closet in an accessible stall and modifying the Mens restroom to add an accessible water closet in a stall and a urinal and add two new water closets; install suspended accoustical ceiling grid, interior finishes, accordion door and millwork; and to upgrade electrical, plumbing & mechanical. Note: This site and all buildings were constructed in Ada County and annexed into Boise City on 12/29/04. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20083/18/20083/18/2008PPASS
DetailsJim Storey
harvey Phone #: ###-####
DOC - Permit Finaled3/18/20083/18/20083/18/2008PPASS
DetailsJim Storey
FIRE-Final Inspection3/17/20083/18/20083/18/2008APASS
DetailsForrest France
Fire life safety inspection passed, incorrect sample tube placement at two duct detectors repaired while on site, weak battery at the EM light in the electrical room to be replaced as agreed.
BLD-Framing/Rough-in3/14/20083/14/20083/14/2008PPASS
DetailsJim Storey
harvey Phone #: ###-#### ceilling ok for cover.
BLD-Framing/Rough-in1/28/20081/29/20081/29/2008APASS
DetailsJim Storey
Harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Conference12/26/200712/27/200712/27/2007PPASS
DetailsJim Storey
Need to schedule a conference with Jim Storey on this remodel and the exterior fire walls. Currently all walls are opened up and want his input. Contact the Super. Harvey Day ####-#### Phone #: ###-#### Internet Inspection Request from: Stacie Irish revied plan and walked job site.