BLD-Final | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Jim Sly
|
|
|
All inspections are complete pending Dena Gambrel''s approval this morning. Call me if you have any questions of if the gate is locked. Phone #: ###-#### Internet Inspection Request from: Mark Bowen OK for Perm Occ.
|
Code Occupancy Approval | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Dena Gambrel
|
|
|
|
Code Occupancy Approval | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Dena Gambrel
|
|
|
2-4-08 1304 No landscape plans on location. Informed Mark and a correction notice was left on location.
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Final Inspection | 2/3/2008 | 2/4/2008 | 2/4/2008 | A | FAIL |
Troy Cobbley
|
|
|
The exit discharge lighting needs to be provided as per the originally approved plans. Also the gate through the fence needs to meet the requirments of chapter 10 access controlled egress doors since it has a magnet/security system partially installed.
|
FIRE-Final Inspection | 2/3/2008 | 2/4/2008 | 2/3/2008 | A | CANC |
Troy Cobbley
|
|
|
Ready after 9:00 am Phone #: ###-#### Internet Inspection Request from: Mark Bowen Inspection cancelled from web by: Mark Bowen
|
BLD-Framing/Rough-in | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
Mark Bowen ###-####
|
BLD-Concrete | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Tom Arcoraci
|
|
|
Interior concrete slab for bathroom floor. Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
BLD-Conference | 10/9/2007 | 10/11/2007 | 10/11/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/9/2007 at 5:27:56 PM. Contact: ###-####. needs to resubmit for bath room addition
|
BLD-Footing | 10/9/2007 | 10/10/2007 | 10/10/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/9/2007 at 12:36:19 PM. Contact: ###-####.
|