BLD-Final | 3/7/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Dave Hannah
|
|
|
lyndon Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety final inspection passed, agreed to allow posting of temporary max occupant load signs with verification by receipt that permanent signs have been ordered, items on correction notice are finished, verified with plan reviewer R. Hill relocation of the front street exit door to 12th street is acceptable.
|
FIRE-Final Inspection | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | NR |
Forrest France
|
|
|
Need project related fire sprinkler permit finaled prior to building life safety approval, noted sprinkler permit is not yet issued. Reviewed with contractor noted defficient items to be amended prior to life safety final.
|
BLD-Final | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | NR |
Dave Hannah
|
|
|
Lyndon; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trade to final first
|
BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | PART |
Dave Hannah
|
|
|
Linden ###-#### ok to pour ftg for column cover beam pou stairs cover wall after plb and elec oks
|