Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-02354
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 9272 PIERCE PARK RD
Project NamePIERCE PARK HORSE ARENA
Customer Number 
ePlanReviewNo
Description
Pierce Park Horse Arena - To construct a new 15,000 square foot, one story, pre-engineered metal building and related site improvements. This building will be used as a horse riding arena and will contain a large riding arena along with restrooms, utility room and a horse washing area. This building will be fire sprinkled with a dry system with a 50,000 gallon onsite water storage tank. The arena panels are to be arranged in a manner that will not block the required egress paths from the building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/21/20087/23/20087/23/2008APASS
DetailsDave Hannah
Please call when on your way out. Thanks! Phone #: ###-#### Internet Inspection Request from: Greg Hayes
FIRE-Final Inspection7/21/20087/22/20087/22/2008APASS
DetailsTroy Cobbley
Life safety passed. Structural inspector to please verify that the "Maximum Occupant Load" signs have been placed at the exits.
Code Occupancy Approval6/10/20086/10/20086/10/2008PPASS
DetailsMichael Garner
site inspection complete - work completed according to approved plans and permits - PASS
BLD-Wall cover5/7/20085/7/20085/7/2008PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
interior rooms ok
BLD-Framing/Rough-in5/1/20085/1/20085/1/2008PPASS
DetailsTony Young
Framing on interior rooms Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Framing/Rough-in4/30/20084/30/20085/1/2008PCANC
DetailsTony Young
Framing on interior rooms Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Framing/Rough-in4/30/20085/1/20085/1/2008ACANC
DetailsTony Young
Framing on interior rooms Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Footing4/17/20084/18/20084/18/2008APART
DetailsTony Young
Good afternoon, the requested inspection is for the Water Tank Footings. Please call with any questions - ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Greg Hayes
ok pendig S. I. REPORT
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes
already done
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Foundation3/6/20083/6/20083/6/2008PPASS
DetailsTony Young
Chuck Brett to pour around 2:30 pm. Thanks Shane Treasure. Phone #: ###-#### Internet Inspection Request from: Shane Treasure
end wall and last cross tie
BLD-Foundation3/5/20083/5/20083/5/2008PPASS
DetailsTony Young
Chuck Brett to pour concrete at 1PM. If you have a delay please call Shane Treasure at ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shane Treasure
north end wall and cross over tie ok
BLD-Footing2/28/20082/29/20082/29/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
cross tie
BLD-Footing2/28/20082/28/20082/28/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasureon cross wip over ftg
wip
BLD-Footing2/27/20082/27/20082/28/2008PPART
DetailsMike Jordan
Chuck Brett to place concrete at 1 PM. Phone #: ###-#### Internet Inspection Request from: Shane Treasure
cross tie ok,, pend S. I report
BLD-Foundation2/21/20082/22/20082/22/2008PPART
DetailsDave Hannah
Requested by Chuck Brett(West Reginal) Phone #: ###-#### Internet Inspection Request from: Shane Treasure second half ok to pour
BLD-Footing2/19/20082/19/20082/19/2008APART
DetailsTony Young
Sub is pouring at 9AM. Thanks Shane Treasure
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
ok as noted on plans,, also pending special inspection report
BLD-Foundation1/14/20081/15/20081/15/2008APART
DetailsTony Young
mud here at 1-chuck Phone #: ###-####
as noted on plans
BLD-Footing1/14/20081/14/20081/14/2008PCANC
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Footing1/13/20081/14/20081/14/2008ANR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
re-sched for early pm
BLD-Footing1/11/20081/14/20081/11/2008ACANC
DetailsTony Young
We have concrete ordered for 11:00 am. Please inspect before pour. Thanks Chuck Brett. Phone #: ###-#### Internet Inspection Request from: Shane Treasure Inspection cancelled from web by: Shane Treasure