BLD-Final | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PASS |
Jim Sly
|
|
|
OK for Perm Occ.
|
FIRE-Final Inspection | 8/31/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | FAIL |
Troy Cobbley
|
|
|
Provide the re-arranged main exit hardware and annual inspections for both of the fire extinguishers.
|
BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | NR |
Jim Sly
|
|
|
Larry please call 30 min before going out Phone #: ###-#### Need fire final
|
BLD-Framing/Rough-in | 10/8/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Jim Sly
|
|
|
larry Note: please call 1/2 hr prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with mark sentennos permission for the use of the conference room. The other portions of this scope of work have not been completed. I notified the builder that the temp was only good for 90 days
|
BLD-Final | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | PART |
Jim Sly
|
|
|
larry Phone #: ###-#### OK for temp Occ......OK to use Classroom and continue to work on areas unfinished.
|
FIRE-Final Inspection | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | FAIL |
Troy Cobbley
|
|
|
The construction was not complete. The contractor wanted a temporary occupancy for the classroom. I deferred him to dave hanniman for permission.
|
FIRE-Final Inspection | 4/4/2008 | 4/4/2008 | 4/4/2008 | P | FAIL |
Troy Cobbley
|
|
|
Three messages were left on the phone and a business card left on site but there was no access to the project. No inspection performed.
|
BLD-Conference | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | DONE |
Jim Sly
|
|
|
larry Note: please call 1/2 hr prior to conference Phone #: ###-#### Questions being answered by Architect
|
BLD-Framing/Rough-in | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | PASS |
Jim Sly
|
|
|
tony Phone #: ###-####
|