Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-02401
StatusFinaled
Name SUNSET RIDGE CONSTRUCTION
Site Address 10096 W FAIRVIEW AVE Unit: 160
Project NameFairview Office Park Bldg #3
Customer Number 
ePlanReviewNo
Description
(ENTRUST OF IDAHO - Fairview Office Park- Bldg #3) This building is NOT fire sprinklered. To perform interior tenant improvement work within a 1,859 square foot building. The building shell was constructed under permit BLD04-01644. Work is to include interior nonbearing walls, one restroom accessible to the disabled, interior doors, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/1/20099/1/20099/1/2009PPASS
DetailsJim Sly
OK for Perm Occ.
FIRE-Final Inspection8/31/20099/1/20099/1/2009APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection8/28/20098/28/20098/28/2009PFAIL
DetailsTroy Cobbley
Provide the re-arranged main exit hardware and annual inspections for both of the fire extinguishers.
BLD-Final8/27/20098/28/20098/28/2009ANR
DetailsJim Sly
Larry please call 30 min before going out Phone #: ###-####
Need fire final
BLD-Framing/Rough-in10/8/200810/9/200810/9/2008PPASS
DetailsJim Sly
larry Note: please call 1/2 hr prior to inspection Phone #: ###-####
FIRE-Final Inspection4/22/20084/22/20084/22/2008PPART
DetailsTroy Cobbley
A temporary occupancy was given with mark sentennos permission for the use of the conference room. The other portions of this scope of work have not been completed. I notified the builder that the temp was only good for 90 days
BLD-Final4/22/20084/22/20084/22/2008PPART
DetailsJim Sly
larry Phone #: ###-####
OK for temp Occ......OK to use Classroom and continue to work on areas unfinished.
FIRE-Final Inspection4/7/20084/7/20084/7/2008PFAIL
DetailsTroy Cobbley
The construction was not complete. The contractor wanted a temporary occupancy for the classroom. I deferred him to dave hanniman for permission.
FIRE-Final Inspection4/4/20084/4/20084/4/2008PFAIL
DetailsTroy Cobbley
Three messages were left on the phone and a business card left on site but there was no access to the project. No inspection performed.
BLD-Conference11/30/200711/30/200711/30/2007PDONE
DetailsJim Sly
larry Note: please call 1/2 hr prior to conference Phone #: ###-####
Questions being answered by Architect
BLD-Framing/Rough-in10/26/200710/26/200710/26/2007PPASS
DetailsJim Sly
tony Phone #: ###-####