BLD-Other | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/11/2008 at 9:58:23 AM. Contact: ###-####.
|
DOC - Permit Finaled | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 8/8/2008 | 8/8/2008 | 8/8/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/8/2008 at 8:09:20 AM. Contact: ###-####.contractor is going to recall this,, 301 call 415 prior to going out,, ok for TI bld 08-01542 occ.
|
FIRE-Conference | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | DONE |
Forrest France
|
|
|
Remainder of building shell life safety issues are finished.
|
BLD-Conference | 8/6/2008 | 8/6/2008 | 8/6/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/6/2008 at 7:05:48 AM. Contact: ###-####.
|
BLD-Conference | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/30/2008 at 3:15:11 PM. Contact: ###-####.
|
BLD-Conference | 6/19/2008 | 6/19/2008 | 6/19/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/19/2008 at 7:09:47 AM. Contact: ###-####.
|
BLD-Final | 6/4/2008 | 6/5/2008 | 6/5/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/4/2008 at 7:13:55 PM. Contact: ###-####. ok for ti occ.
|
FIRE-Final Inspection | 6/4/2008 | 6/5/2008 | 6/5/2008 | P | PASS |
Forrest France
|
|
|
Building shell life safety inspection completed acceptable with the exception of missing fire lane signage to be installed today. Remainder of fire life safety issues including the 2nd floor area of refuge and elevator recall to be tested and approved in conjunction with and prior to tenant occupancy permit finals.
|
Code Occupancy Approval | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Wm. Michael Meloy
|
|
|
pat child Phone #: ###-####
|
Code Occupancy Approval | | | 6/2/2008 | | FAIL |
Wm. Michael Meloy
|
|
|
Inspection on May 30, 2008, found the rear enclosure not finished, but needing stucco. OK to bond for $1,100.00. for temp occupancy.
|
BLD-Framing/Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 4:41:54 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/28/2008 | 5/29/2008 | 5/29/2008 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/28/2008 at 4:41:54 PM. Contact: ###-####. out of time rolled over.
|
BLD-Framing/Rough-in | 5/27/2008 | 5/28/2008 | 5/28/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/27/2008 at 4:12:18 PM. Contact: ###-####.ceilling ok pending ele aproval.
|
FIRE-Conference | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | DONE |
Forrest France
|
|
|
Discussion with contractor regarding project schedule and building permit shell and tenant permit approvals prior to elevator completion.
|
BLD-Conference | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/21/2008 at 4:55:17 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/23/2008 | 4/24/2008 | 4/24/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/23/2008 at 4:05:53 PM. Contact: ###-####. hard lid framing ok
|
BLD-Framing/Rough-in | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/2/2008 at 5:58:37 AM. need to fire stop.
|
BLD-Framing/Rough-in | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 10:13:35 AM. Contact: ###-####. truss bracing ok
|
BLD-Framing/Rough-in | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2008 at 6:46:46 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/20/2008 at 8:41:33 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/17/2008 at 6:06:52 AM. Contact: ###-####. remove wall heater from p/l wall. misc. framing conections/ fire blk at ceilling line. ok to insulate.
|
BLD-Framing/Rough-in | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/11/2008 at 2:00:58 PM. Contact: ###-####. first floor framing ok/ bolts and mlb king stud to header/ strap top plates for continous aplaction. fire wall gyp being instaled as per accepted joint aplacation at joist locations in p/l walls and encloser walls back of elvator.
|
BLD-Footing | 3/12/2008 | 3/13/2008 | 3/12/2008 | A | CANC |
Jim Storey
|
|
|
Contact: ###-####.
|
BLD-Framing/Rough-in | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/7/2008 at 5:15:23 PM. Contact: ###-####. exterior stucco ok to cover.
|
BLD-Framing/Rough-in | 3/5/2008 | 3/6/2008 | 3/6/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/5/2008 at 11:01:44 AM. Contact: ###-####. ok to start interior cover of p/l wall to create rating and start stair encloser wall on ti side.
|
BLD-Framing/Rough-in | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/3/2008 at 3:35:16 PM. Contact: ###-####.se and nw brace panel nailling ok under fur out arch. feacher.
|
BLD-Framing/Rough-in | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/27/2008 at 10:12:06 AM. Contact: ###-####.roof deck straps and naiolling ok/ insulation ok.
|
BLD-Framing/Rough-in | 2/25/2008 | 2/26/2008 | 2/25/2008 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/25/2008 at 7:14:18 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 25 2008 6:07PM.
|
BLD-Conference | 2/19/2008 | 2/20/2008 | 2/20/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/19/2008 at 8:56:47 AM. Contact: ###-####. fire wall at struc. members ok for pre gyp.
|
BLD-Conference | 2/12/2008 | 2/13/2008 | 2/13/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/12/2008 at 5:51:25 PM. Contact: ###-####.aproved es report for 1 hour assembly fra-103/ es 1254 and 1318. sent to be archived with aproved docs.
|
BLD-Conference | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/5/2008 at 4:37:49 PM. Contact: ###-####. enginreering for roof suport to be submited/ floor protection as per aproved submital from plan review.
|
BLD-Footing | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/14/2007 at 10:17:18 AM. Contact: ###-####. placed with si reports pending
|
BLD-Foundation | 12/11/2007 | 12/12/2007 | 12/12/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/11/2007 at 4:47:06 PM. Contact: ###-####.placed with si
|
BLD-Footing | 12/6/2007 | 12/6/2007 | 12/6/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/6/2007 at 7:56:27 AM. Contact: ###-####.pwsi
|
BLD-Footing | 12/4/2007 | 12/5/2007 | 12/5/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/4/2007 at 8:27:02 AM. Contact: ###-####. si on site ok pending report after sampling and testing of concrete.
|