Permit Information
Permit NumberBLD07-02455
StatusFinaled
Name EKC INC
Site Address 222 N 13TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(IDAHO SCHOOL BOARDS ASSOCIATION) (2-5-08) PLAN MODIFICATION TO MAINTAIN THE 2ND STORY RESTROOMS AS THEY ARE, TO CHANGE THE STAIRWAY ENCLOSURE AT THE 2ND STORY, AND TO FILL IN A 2ND STORY WINDOW. This building is NOT fire sprinklered. To remodel an existing 5,155 square foot, 2 story building (2,572 square foot 1st story and 2,583 square foot 2nd story). Two restrooms located on the 1st story will be upgraded to be accessible to the disabled. Work is to include a 1-hr stairway enclosure, concrete footings, wood columns, wood beam, interior nonbearing walls, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. CZC07-00246 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/19/20086/20/20086/20/2008PPASS
DetailsTony Young
Rob- Phone #: ###-####
FIRE-Final Inspection6/19/20086/20/20086/20/2008APASS
DetailsTroy Cobbley
fire life safety passed
FIRE-Final Inspection6/19/20086/19/20086/19/2008PFAIL
DetailsTroy Cobbley
Remove the thumbturn, provide indicator and sticker as discussed at the west main exit. All other items are passed.
Code Occupancy Approval6/19/20086/19/20086/19/2008PPASS
DetailsMichael Garner
site inspection complete - I found that the work has been completed according to approved plans and permits - PASS
BLD-Aging Inspection5/13/20085/13/20085/16/2008 PASS
DetailsTony Young
BLD-Framing/Rough-in5/14/20085/14/20085/14/2008PPART
DetailsJim Sly
rob Phone #: ###-####
OK to cover inside/outside walls and ceiling ( main floor area) of 1hr stair enclosure.
BLD-Framing/Rough-in5/8/20085/9/20085/9/2008APART
DetailsMike Jordan
rob Phone #: ###-####. Ok to rock hardlids at 1st floor ceiling. 1hr. assemblies for exit corridor enclosure has many issues. Noted unprotected openings in ceiling assembly, wall assembly and additional conduit that penetrates exit corridor and does not serve corridor. Also requested UL approved assembly for floor/ceiling assembly at 1hr. corridor, 1st. floor. told contractor not to proceed in this area.
BLD-Framing/Rough-in5/7/20085/7/20085/7/2008PPART
DetailsDave Hannah
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to one side needs to fire block and finish one hr around stairs