BLD-Final | 10/16/2008 | 10/17/2008 | 10/17/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled via mobile device. Phone #: 5737193. ok for temp occ. Will be ok for perm occ. once zoning receives and approves new elevation detail showing additional overhead door.
|
FIRE-Final Inspection | 10/16/2008 | 10/17/2008 | 10/17/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/15/2008 | 10/16/2008 | 10/16/2008 | P | NR |
Mike Jordan
|
|
|
eric, please call to make sure he''s there Phone #: ###-####
|
FIRE-Final Inspection | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where exit discharge lighting and interior emergency lighting is inoperative. Need the project related fire alarm permit finaled as well. Scott Arleno is ok with the fire dept access through the gate on the north side of the building.
|
Code Occupancy Approval Temp | | | 10/8/2008 | | DONE |
|
|
|
Staff has issued the applicant a 30 day temporary occupancy. The 30 day period will allow the applicant adequate time to receive a staff level design review approval to add an overhead door and a man door to the east elevation. Once the applicant has submitted the staff level DR application, the applicant is also required to update the building plans to reflect the additional overhead door and the man door that was constructed within the east elevation. ANT 10-8-08
|
Code Occupancy Approval | | | 9/26/2008 | | FAIL |
|
|
|
Staff arrived at the site and waited for 20 minutes for the applicant to arrive. Staff did briefly look at the site. When staff asked why the pre-finished metal shade coverings over the windows had not been installed, the applicant replied,"those will be installed later." Staff responded by stating that the awnings either had to be installed or bonded for in order for occupancy to be issued. The applicant grabbed the plans and took them into the building. Staff asked the applicant if they wanted staff to go over the entire site to let them know if there were any other chnages necessary to obtain occupancy but the applicant replied by saying that "all of that could be done once the inspection had been rescheduled. A new reinspection will be scheduled once the window shades have been installed. 9-26-08
|
BLD-Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | NR |
Mike Jordan
|
|
|
Eric- call 30 mins prior to going Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2008 | 8/15/2008 | 8/18/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/15/2008 at 9:13:07 AM. Contact: ###-####. Sheet rock for riser room.
|
BLD-Framing/Rough-in | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 8:45:57 AM. Contact: ###-####.Interior framed walls only. no grid or soffitt.
|
BLD-Framing/Rough-in | 7/15/2008 | 7/15/2008 | 7/16/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/15/2008 at 10:57:35 AM. Contact: ###-####. Wants to rock from top of wall to ceiling. Needs to contact other trade insp. for approval.
|
BLD-Foundation | 3/5/2008 | 3/5/2008 | 3/5/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/5/2008 at 8:43:29 AM. Contact: ###-####. Interior column pad footings.
|
BLD-Foundation | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/14/2008 at 4:29:38 PM. Contact: ###-####. wip on perimeter stemwall. Need RFI from engineer for fix on vertical steel. Vertical steel placed at 8" oc. Needs to be 2#5 at 24" oc.
|
BLD-Foundation | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/8/2008 at 3:30:32 PM. Contact: ###-####. perimeter footing.
|
BLD-Foundation | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/5/2008 at 1:55:50 PM. Contact: ###-####. delay due t weather. wip on installing vert. Steel at perimeter footings. Project will have special insp.
|