BLD-Final | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | PASS |
Tony Young
|
|
|
nat Phone #: ###-#### house ok,, POOL IS NOT!!!
|
DOC - Permit Finaled | 3/25/2008 | 3/25/2008 | 3/25/2008 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Grading Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
FIRE-Final Inspection | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | CANC |
Troy Cobbley
|
|
|
nat Phone #: ###-#### Wrong inspection type called in. I contacted Nate.
|
BLD-Final | 3/14/2008 | 3/14/2008 | 3/14/2008 | P | FAIL |
Tony Young
|
|
|
nate Phone #: ###-#### walk through only,, c/n posted,, also still need hillside
|
BLD-Final | 3/13/2008 | 3/14/2008 | 3/14/2008 | A | NR |
Tony Young
|
|
|
nate Phone #: ###-#### need hill side 1st
|
BLD-Final | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | NR |
Tony Young
|
|
|
nate Phone #: ###-#### need hill side signoff 1st
|
BLD-Energy code compliance | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PASS |
Tony Young
|
|
|
Doug ###-####
|
BLD-Framing/Rough-in | 1/3/2008 | 1/4/2008 | 1/4/2008 | A | PASS |
Tony Young
|
|
|
doug Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | NR |
Tony Young
|
|
|
Jason; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt on site walk through,, need trades,, seal pack
|
BLD-Framing/Rough-in | 12/20/2007 | 12/21/2007 | 12/21/2007 | P | PART |
Tony Young
|
|
|
jason Phone #: ###-#### exterior stapling ok, verify int HDs later
|
BLD-Footing | 11/19/2007 | 11/20/2007 | 11/20/2007 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/19/2007 at 11:36:31 PM. Contact: ###-####. retaining walls ok
|
BLD-Footing | 11/15/2007 | 11/15/2007 | 11/15/2007 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/15/2007 at 12:21:51 AM. Contact: ###-####. retaining wall ftgs
|
BLD-Foundation | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | PART |
Dave Hannah
|
|
|
ryan Phone #: ###-#### crew about 95% complete
|
BLD-Footing | 10/28/2007 | 10/29/2007 | 10/29/2007 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/28/2007 at 8:49:05 PM. Contact: ###-####. wip on new wall design,, ok to pour after
|
BLD-Footing | 10/26/2007 | 10/26/2007 | 10/29/2007 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/25/2007 at 11:02:16 PM. Contact: ###-####.
|
BLD-Footing | 10/25/2007 | 10/26/2007 | 10/26/2007 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/25/2007 at 11:02:16 PM. Contact: ###-####. conf only,, need revision from engineer on design due to elevation of dig
|