Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-02475
StatusFinaled
Name MATERIAL FLOW CONVEYOR SYSTEMS
Site Address 601 W GOWEN RD
Project NameWESTERN POWER SPORTS
Customer Number 
ePlanReviewNo
Description
(WESTERN POWER SPORTS - HAND-PICK RACKS - To install 30 foot high three level racking system adjacent to existing racking in warehouse area per approved engineered plans. Work to include, anchoring racking per engineering report, install exit signs at stairways and as required by field inspection, install egress lighting, this building is fully fire sprinkled any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/9/200711/13/200711/13/2007PPASS
DetailsJim Storey
mike Phone #: ###-####
DOC - Permit Finaled11/13/200711/13/200711/13/2007PPASS
DetailsJim Storey
FIRE-Final Inspection11/9/200711/13/200711/13/2007APASS
DetailsForrest France
All repairs were made as per Forrest notes.
FIRE-Final Inspection11/7/200711/8/200711/8/2007AFAIL
DetailsForrest France
Need to add exit signs at locations as discussed, EM lighting at two locations is not functional, PFE's are okay, will test remaider of EM lighting at next inspection.
BLD-Final11/7/200711/8/200711/8/2007PCANC
DetailsJim Storey
mike gulley; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt unable to final to fire inspect not correct