BLD-Final | 5/14/2013 | 5/14/2013 | 5/14/2013 | A | PASS |
Jim Storey
|
|
|
Structural repairs and engineers final letter of completion under BLD11-01031.
|
DOC - Permit Finaled | | | 5/14/2013 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/21/2013 | 2/21/2013 | 2/27/2013 | | DEFR |
Jim Storey
|
|
|
pending action from planreview for l/c. insp. is compliant for aproval
|
BLD-Aging Inspection | 11/13/2012 | 11/13/2012 | 11/14/2012 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 8/14/2012 | 8/14/2012 | 8/17/2012 | | PASS |
Jim Storey
|
|
|
wip/ letter on file w BO and planreview.
|
BLD-Aging Inspection | 5/14/2012 | 5/14/2012 | 5/16/2012 | | PEND |
Jim Storey
|
|
|
no requist to insp.
|
BLD-Aging Inspection | 2/13/2012 | 2/13/2012 | 2/17/2012 | | PASS |
Jim Storey
|
|
|
letter recieved and fab of material is in progress for beam repairs. letter on file and with b.o.
|
BLD-Framing/Rough-in | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | CANC |
Jim Storey
|
|
|
9:30 apt.
|
BLD-Framing/Rough-in | 11/14/2011 | 11/14/2011 | 11/14/2011 | P | PASS |
Jim Storey
|
|
|
dan Phone #: ###-####
|
BLD-Aging Inspection | 9/21/2011 | 9/21/2011 | 9/26/2011 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/21/2011 | 6/21/2011 | 6/22/2011 | | PART |
Jim Storey
|
|
|
reviewed joist ledger aplaction need engineer on site review to remove shoring.
|
BLD-Conference | 3/16/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Jim Storey
|
|
|
doug ###-#### aptt. 3:00 will have walkthru w arch/engineer/contractor tue 3:00 pm
|
BLD-Aging Inspection | 2/28/2011 | 2/28/2011 | 3/3/2011 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Jim Storey
|
|
|
Re-open per Jason BLais & Bob Archibald Final inspection and structural engineer verification needed
|
DOC - Permit Expired | 7/30/2010 | 8/4/2010 | 8/9/2010 | A | PASS |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD-Aging Inspection | 7/30/2010 | 7/30/2010 | 7/30/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/10/2010 | 5/10/2010 | 5/10/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Jim Storey
|
|
|
Andrew Phone #: ###-####
|
BLD-Framing/Rough-in | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | PART |
Jim Storey
|
|
|
p.j. - please call 1/2 hr prior to inspection Phone #: ###-#### s-2 #4 wall aproved for cover.
|
BLD-Footing | 4/17/2008 | 4/18/2008 | 4/18/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/17/2008 at 3:05:09 PM. Contact: ###-####. rebar ok need engineer to adress epoxy not insp. by si at instaltion/ pending concrete report by strata.
|
BLD-Conference | 2/22/2008 | 2/26/2008 | 2/26/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/22/2008 at 8:20:22 AM. Contact: ###-####. meet with engineer/ken howl/ and contractor/ have investagation demo in progress will reconven when ready.
|
BLD-Aging Inspection | 2/1/2008 | 2/1/2008 | 2/6/2008 | | NR |
Jim Storey
|
|
|
talked with contractor office. they said they would call back as to if they where going to proceed with the work or not. owner of building had a hold on the project was the understanding that i recieved and did not get a return call to confirm.
|