Permit Number | BLD07-02493 |
Status | Finaled |
Name |
STEED CONSTRUCTION
|
Site Address |
4719 S MARKET ST
|
Project Name | MARKET STREET WAREHOUSE |
Customer Number | |
ePlanReview | No |
Description |
(SPIRIT DISTRIBUTING) To construct new loading dock, new fork lift ramp, install new 3ft by 7ft. man door in south wall of warehouse, new entrance driveway, parking lot modifications, landscaping, site lighting (exterior), fencing, and storm draining system. The fork lift ramp is not considered a means of egress; therefore, the new man door cannot be labeled as an exit. The loading dock was not reviewed for accessibility; however, architect was warned that future remodels may require an accessible means of egress to the space. A CONDITION OF FINAL APPROVAL REQUIRES A ... "FINAL INSPECTION OF SITE GRADING & DRAINAGE WORK SHALL BE DONE BY THE DESIGN ENGINEER," A LETTER OF APPROVAL FROM THE ENGINEER OF THE ABOVE NOTED ITEMS SHALL BE FURNISHED TO PUBLIC WORKS DEPARTMENT PER "CONDITIONS OF APPROVAL", **TLW**
|