Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-02538
StatusFinaled
Name KIRSCHNER HOMES
Site Address 5500 S FEDERAL WAY
Project NameORE/PAC
Customer Number 
ePlanReviewNo
Description
(ORE/PAC - Fire Restoration Repair) To repair 12' x 12' portion of roof/ceiling area, soffit & mansard. To add a new exterior door and associated landing. Analysis performed by Dean Briggs, Briggs Engineering. To remove drywall from wall and ceiling; remove 2" x 8" joists, roof sheathing and roof covering. To replace with like materials to match the remaining structure finishes for roof/ceiling portion and to add new studs in exterior bearing wall beside existing charred studs; to repair electrical & mechanical damaged by fire, all per submitted engineering Structural Design data. Separate applications, plans and permits are required for electrical, mechanical, sprinkler and alarm modifications. CZC07-00257 drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/200712/3/200712/3/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2007 at 7:34:22 PM. Contact: ###-####.
DOC - Permit Finaled12/3/200712/3/200712/3/2007PPASS
DetailsJim Storey
FIRE-Final Inspection11/29/200711/30/200711/30/2007APASS
DetailsForrest France
Fire life safety is acceptable per scope of work, noted missing hardware at the door to the display room to be verified for code compliance at structural final.
BLD-Conference11/14/200711/15/200711/15/2007APASS
DetailsJim Storey
eric Phone #: ###-####
BLD-Final11/13/200711/13/200711/13/2007PNR
DetailsJim Storey
eric Phone #: ###-####
BLD-Framing/Rough-in10/12/200710/12/200710/12/2007PPASS
DetailsJim Storey
eric - shear wall Phone #: ###-####
BLD-Energy code compliance10/10/200710/11/200710/11/2007APASS
DetailsJim Storey
eric - insulation Phone #: ###-####
BLD-Conference9/27/20079/27/20079/27/2007PPASS
DetailsJim Storey
Eric ###-#### //per Jim Storey ok to set up conference reviewed exstent of fire damage prior to permt being isued to start work.