Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-02583
StatusFinaled
Name CCMG
Site Address 2250 S VISTA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(EL-ADA COMMUNITY ACTION PARTNERSHIP) This building is NOT fire sprinklered. To remodel an existing 3,952 square foot building for a new office tenant. Work is to include 4 new exterior windows in the South wall, interior nonbearing walls, interior doors with sidelights, suspended ceilings, millwork, and interior finishes. In addition, two existing restrooms will be upgraded to be accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. CZC07-00254 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/11/20086/11/20086/11/2008PPART
DetailsJim Storey
Richard; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt final ok pending p&z sign off.
FIRE-Final Inspection6/10/20086/11/20086/11/2008APASS
DetailsForrest France
Correction notice items listed at the previous inspection verified for compliance, life safety finaled.
Code Occupancy Approval  6/11/2008 DONE
FIRE-Final Inspection5/20/20085/20/20085/20/2008PFAIL
DetailsForrest France
Fire code review notes indicate the existing non-required fire suppression system if removed shall require a demo permit. Noted system has been deleted without issuance of a permit. Also need to provide a current inspection/certification tag for the fire extinguisher, remainder of life safety is satisfactory.
BLD-Conference5/6/20085/6/20085/6/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/6/2008 at 10:32:09 AM. Contact: ###-####.
FIRE-Final Inspection4/23/20084/23/20084/23/2008PNR
DetailsForrest France
Project work is not completed for final life safety inspection at this time.
BLD-Framing/Rough-in3/19/20083/20/20083/20/2008APASS
DetailsJim Storey
jason \\ceiling Phone #: ###-#### ceilling ok need to check for spreader bars thur out at final.
BLD-Other1/18/20081/22/20081/22/2008APASS
DetailsJim Storey
jason Note: shear early as possible Phone #: ###-#### sheer pannels on south wall ok for cover.
BLD-Framing/Rough-in1/15/20081/16/20081/16/2008APASS
DetailsJim Storey
jason Phone #: ###-####