BLD-Final | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PASS |
Jim Sly
|
|
|
ron Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PART |
Mike Jordan
|
|
|
ron Phone #: ###-####. Will sign off as soon as shell and core is signed off. Need letter from special insp. agency for shell and core construction.
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
The shell permit has not been finaled yet. The on site contact did not have drawings or notes for the shell permit so I could not perform an inspection. The building address needs to be installed so that it faces the named street. When shell permit is finaled and the address provided this tenant permit life safety inspection can be passed..
|
BLD-Other | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Jim Sly
|
|
|
ron Note: ceiling grid Phone #: ###-####
|
BLD-Conference | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | NR |
Jim Sly
|
|
|
Need all req finals after shell/core final.
|
BLD-Conference | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | CANC |
Jim Sly
|
|
|
Notified Ron that shell needs to be finaled B 4 TI can be finaled.
|
BLD-Energy code compliance | 12/26/2007 | 12/27/2007 | 12/27/2007 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|