BLD-Final | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PASS |
Tom Arcoraci
|
|
|
jed Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 12/12/2008 | 12/15/2008 | 12/15/2008 | P | PART |
Mike Jordan
|
|
|
JED Phone #: ###-####. Temp occ. granted. Still need letter from special insp. agency and is waiting for the remainder of door hardware for double doors. Also recieved letter with employees signatures stating that they were briefed and trained on manual flush bolts.
|
FIRE-Final Inspection | 12/12/2008 | 12/15/2008 | 12/15/2008 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with sam rogers permission until the fire hydrant is active. United Water installed it today and it will be active as soon as the thrust block has set up.
|
BLD-Other | 12/11/2008 | 12/11/2008 | 12/11/2008 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/11/2008 at 7:40:27 AM. Contact: ###-####. Note: Please call 1/2 hr prior to inspection no manuel flush bolts allowed on double doors
|
FIRE-Conference | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements for this project. It appears per the fire review comments that a fire hydrant was to be installed out front and fire sprinklers/alarm systems were to be installed as well. These items have not been installed. Scott and Sam have been contacted.
|
BLD-Energy code compliance | 11/6/2008 | 11/7/2008 | 11/7/2008 | A | PASS |
Tom Arcoraci
|
|
|
jed Phone #: ###-####
|
BLD-Framing/Rough-in | 11/5/2008 | 11/6/2008 | 11/6/2008 | A | PART |
Tom Arcoraci
|
|
|
jed Note: please call 1/2 hr prior to inspection to meet with Phone #: ###-#### wip ok 3 hr wall
|
BLD-Wall cover | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 10:08:23 AM. Contact: ###-####. office areas only ok to cover
|
BLD-Framing/Rough-in | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 10:07:52 AM. Contact: ###-####. office areas only ok to cover,, still need to inspect 3 hr wall
|
BLD-Framing/Rough-in | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/28/2008 at 8:49:58 AM. c/n need floor trusses repair for top chord ele and plm cuts/ foam seal top plate penatrations fr fire blk./ nail fool trusses at hanger at header in hall/ provide listing for fire stopping of 3 hr wall/ provide r-38 verifcation of roof insulation. ok to insulate office partions.
|
BLD-Wall cover | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/28/2008 at 8:50:32 AM. gyp progression on b sir ok screw sch ok. need fire stop at floor cavity.
|
BLD-Footing | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 8:04:27 AM. Contact: ###-####. Verified 21' rebar UFER installed
|
BLD-Footing | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | PART |
Mike Jordan
|
|
|
jay Phone #: ###-####. wip. Needs to complete install of remaining verts. Reviewed geotech report for subgrade, ok for conc. Noted to Jay that periodoc special insp. is required for verification of mix design and rebar insp.
|
BLD-Footing | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-####. wip on installing reinforcement. Called contractor to have him contact a Geotech engineer to verify the min. 2000 psf soil bearing for footings. Will reschedule additional insp. for the am.
|